Applications ordered newest to oldest.
Section 4.55(1) modification of consent to amend a Water NSW condition
S4.55(1A) - Modification for minor changes to condiitons of consent
Section 4.55(1A) modification to amend the construction staging and other minor changes to conditions
S4.55(1A) - Modification of consent to amend conditions relating to construction staging
Torrens title subdivision
Subdivision of the site into two Torrens Title lots.
Public domain works associated with a new mixed use development including bulk excavation, remediation, civil infrastructure, new and connecting roads, pedestrian and bicycle paths, public open space, lighting, landscaping works and subdivision.
Site excavation, remediation and construction of a mixed use development comprising 9 new buildings (5 mixed use buildings and 4 residential flat buildings), 2 levels of basement car parking and site landscaping. The application is Integrated Development requiring the approval of the Department of Planning and Environment - Water and Water NSW under the Water Management Act 2000.
Demolition of existing site structures and erection of a new temporary (maximum 5 years) single storey exhibition home and associated signage.
Torrens title subdivision of land into 2 lots
D/2024/514 - dedication of land and embelishment as new roads, parks and public domain including completion of Zetland Avenue, extensions of Grandstand Parade, Victoria Park Parade, George Julius Avenue, Ascot Avenue, Defries Avenue, Woolwash Park, Biyanbing Green and Zetland Avenue Open Space.
CFT-9514 Subdivision into two Torrens title lots for road dedication purposes
PAN-31110 - S4.55 (1A) Modification of consent to stage construction of amenities building.
S4.55 1(A) Modification to Condition 69 to relax the requirement for the City to submit the land title registration to the Area Planning Manager prior to OC. Modification or deletion of Condition 96 as discussed in the modification statement. General staging update.
Section 4.55(1A) modification of consent for 'Gunyama Park Aquatic and Recreation Centre'. Proposed changes are to planting strategy.
Section 4.55(1A) of consent for construction of 'Gunyama Park Aquatic and Recreation Centre'. Proposed changes are to southern plant room, building height and services on gym roof.
Section 4.55 (1a) - modify condition 1
S4.55 1(A) Condition 1 - Minor modifications to the approved design. (Refer Modification Statement + Revised Drawings)
S4.55 1(A) Condition 1- minor modification to approved design (refer modification statement and Revised drawings) Condition 26- Modify condition wording ( refer modification Statement )
2 Lot Sub Division related to Gunyama Park
S4.55 (1A) Condition 57 and 58 - Modify condition wording
Section 96 (1A) modification to delete conditions 27, 29, 55, 94, 97, 98
S96(1a) - Condition 68 Site Audit Statement - Amend condition to read 'Prior to issue of an occupation certificate...' instead of 'Prior to issue of a construction certificate...' and other changes to the first paragraph of the condition. Refer to Attachment A for Site Auditor's advice supporting the modifications to the condition.
The proposed development is the staged construction and use of the “Gunyama Park Aquatic and Recreation Centre” comprising an indoor and outdoor aquatic and recreation centre and public park. The proposed works include demolition of existing structures, earthworks and construction of the new facilities. The aquatic centre includes a 50m heated outdoor pool, a heated outdoor leisure pool, a 25m indoor program pool, an indoor hydrotherapy pool, indoor crèche, a licensed cafe, and a health and recreation centre. The park includes a synthetic sports field, playground, skate areas, fitness stations, amenities buildings, bbq areas and landscaping. The proposal is Integrated Development as an approval is required from the NSW Office of Water for temporary dewatering of the site during construction.
Subdivision of the site into two lots.
Section 96(2) Application to delete a condition of the previous development consent, which limited the approval to operate to twelve (12) months, for ongoing use of the site as a service depot. This would include continuation of the previously approved hours of operation: Monday to Friday 7.30am to 5.30pm and Saturday 7.30am to 3.30pm.
Establishment of temporary demountable buildings and offices for use of site as a service depot, for a period of 12 months from the date of determination. Demolition of some existing structures on site.
S96(1A) - Amend the period of time granted in which the deferred commencement conditions are to be satisfied, from 24 months to 36 months.
Installation of 3 City of Sydney Sustainable Sydney 2030 banners each having dimensions 2.5m x 0.8m affixed to 6m high fibre glass poles.
Supplementary infrastructure proposal further to stormwater works proposed in the recent Green Square Town Centre Development application (D/2008/1195). Works proposed include the replacement, enhancement and relocation of storm water culverts and pipes in the vicinity of the sites at 114 - 136 Joynton Avenue.
A free standing sign business identification sign.
Demolition of front building facades at 132-138 Joynton Avenue and 140 Joynton Avenue, and demolition of rear building at 140 Joynton Avenue.