Applications ordered newest to oldest.
Subdivision of the site into two Torrens Title lots.
Public domain works associated with a new mixed use development including bulk excavation, remediation, civil infrastructure, new and connecting roads, pedestrian and bicycle paths, public open space, lighting, landscaping works and subdivision.
PAN-31110 - S4.55 (1A) Modification of consent to stage construction of amenities building.
S4.55 1(A) Modification to Condition 69 to relax the requirement for the City to submit the land title registration to the Area Planning Manager prior to OC. Modification or deletion of Condition 96 as discussed in the modification statement. General staging update.
Section 4.55(1A) modification of consent for 'Gunyama Park Aquatic and Recreation Centre'. Proposed changes are to planting strategy.
Section 4.55(1A) of consent for construction of 'Gunyama Park Aquatic and Recreation Centre'. Proposed changes are to southern plant room, building height and services on gym roof.
S4.55 1(A) Condition 1 - Minor modifications to the approved design. (Refer Modification Statement + Revised Drawings)
S4.55 1(A) Condition 1- minor modification to approved design (refer modification statement and Revised drawings) Condition 26- Modify condition wording ( refer modification Statement )
S4.55 (1A) Condition 57 and 58 - Modify condition wording
Section 96 (1A) modification to delete conditions 27, 29, 55, 94, 97, 98
S96(1a) - Condition 68 Site Audit Statement - Amend condition to read 'Prior to issue of an occupation certificate...' instead of 'Prior to issue of a construction certificate...' and other changes to the first paragraph of the condition. Refer to Attachment A for Site Auditor's advice supporting the modifications to the condition.
The proposed development is the staged construction and use of the “Gunyama Park Aquatic and Recreation Centre” comprising an indoor and outdoor aquatic and recreation centre and public park. The proposed works include demolition of existing structures, earthworks and construction of the new facilities. The aquatic centre includes a 50m heated outdoor pool, a heated outdoor leisure pool, a 25m indoor program pool, an indoor hydrotherapy pool, indoor crèche, a licensed cafe, and a health and recreation centre. The park includes a synthetic sports field, playground, skate areas, fitness stations, amenities buildings, bbq areas and landscaping. The proposal is Integrated Development as an approval is required from the NSW Office of Water for temporary dewatering of the site during construction.
S96(1A) - Amend the period of time granted in which the deferred commencement conditions are to be satisfied, from 24 months to 36 months.
Supplementary infrastructure proposal further to stormwater works proposed in the recent Green Square Town Centre Development application (D/2008/1195). Works proposed include the replacement, enhancement and relocation of storm water culverts and pipes in the vicinity of the sites at 114 - 136 Joynton Avenue.