Applications ordered newest to oldest.
Internal alterations and refurbishment works to the ground floor level of the Burberry Sydney Flagship Store, located at No. 343 George Street, Sydney (former CBC Bank Building). Extended construction hours are also proposed to enable the store to continue trading within its established trading hours.
Removal of existing doors connecting two buildings and replace with wall on Levels 8, 9 and 10.
As part of YCK Laneways Front and Centre Festival, the pedestrianised section of Barrack Street is being activated for a major live music event called Live at YCK (already approved).
Temporary light projection onto the southern façade.
PAN-227135 Alterations to office premises
Alteration and additions to facade and rooftop of a commercial office building including repairs to the sandstone facade and other works
PAN-168333
S4.55(2) - Modification of consent to extend construction hours to be between 7.00am - 7.00am the following day Monday - Saturday inclusive, and between 7.00am - 5.00pm Sunday/public holiday; and modify/delete other conditions of consent.
Alterations and additions to the facade and rooftop of a commercial office building including repairs to the sandstone facade, installing clear window films, repair steel and bronze windows, replace copper weathering and flashings, and install additional external lighting on the eastern and southern facades. The application is Integrated Development requiring the approval of the Heritage Council of NSW under the Heritage Act 1977 NSW.
Foyer carpet to be replaced with vinyl, painting of the internal wall and upgrade of lighting, end of trip facility requires new fittings and fixtures, replace existing bench with laminate, end of trip facility requires regrouting and replace with new mirrors, foyer lockers to be replaced with new lockers with integrated ironing station
Section 96(2) modification of consent for alterations to the existing building. Proposed changes are to the approved construction hours and utilisation of Barrack Street for deliveries and access during construction. Current approved construction hours are 7.00am - 7.00pm, Mondays to Fridays inclusive and 7.00am - 5.00pm Saturdays. Proposed additional construction are 24 hours a day 7 days a week.
Temporarily remove a pendant light frame and acrylic diffuser
Internal alterations and additions to commercial office on Level 5 of Barrack House.
Fireworks display for Christmas concert
Integrated Application (NSW Heritage) - Removal and re-instatement of four existing light box signs located along Barrack Street; Installation of one new light box along Barrack Street; Refurbishment and replacement of two existing Burberry illuminated signs along Barrack Street and George Street; Refurbishment and re-instatement of four banners along George Street and Barrack Street; Removal of existing lighting and installation of new lighting associated with signage and lighting of the column; Replacement of four business identification signs located at the entries to George Street and Barrack Street; Installation of traditional black and gold leaf reverse signs to the interior face of the glazed double doors and sidelights in the George Street lobby; Installation of new business identification signage on the George Street facade and installation of an internal heritage interpretation sign.
Alterations to shop 'Burberry' including internal refurbishment of ground floor and minor external conservation works to building facade.
Internal alterations to commercial office buildings known as the former 'Bank of NSW' and former 'CBC Bank', comprising construction of new doorway openings at levels 7, 8 and 9 to connect the two buildings.
Fitout and alterations and additions to levels 8,9 & 10
Alterations to commercial office building including the removal of concrete slab and the installation of interconnecting stairwell between levels 6 and 7.
Temporary installation of equipment at the Sydney Eye Hospital (8 Macquarie Street) and Burberry Building building (343 George St) for the projection of lasers at Martin Place for the Vivid Festival.
Internal fit out of part of existing office on level 6.
Use of Suite 2.02 for commercial office
Internal fitout of commercial office located on Level 7.
Extension of office fitout works to incorporate balance part of level 5 for continued office use.
Section 96 (1A) modification to reference amended drawings relating to the bronze teller screens on the ground floor or the Burberry retail store.
Integrated Development Application for the installation of external signage and lighting upon the ground level of the former bank chamber building.
Use and fit out of the ground and basement levels of the CBC Bank building as a Burberry retail fashion outlet.
Internal alterations and fit out of part of level 5 of the CBC bank building for continued office use.
Internal fitout of the existing office suite no. 107 on level 1 to accommodate three offices and a boardroom.
Section 95A extension of consent for one year
Internal alterations to existing office Suite 108 on Level 1 to accommodate four offices and one utility room and installation of air conditioning ducts.
Internal office fitout to suite no. 603 on level 6.
Installation of rope access anchoring system on the roof & main facades of the building at the above property to allow full access for window cleaning and general facade monitoring purposes.
Section 96 Modification to Condition 2 to allow use of banners 365 days a year for 5 years.
Review of Notice of Determination
Review Notice of Determination
Strata subdivision of the building, Barrack House also known as 16-20 Barrack Street, into 76 lots and common property
Integrated development application for erection of promotional banners on every second internal central column.
Integrated development application to remove existing 'Virgin' neon sign and 'MEGASTORE' letters above George Street entrance and provide two (2) new double sided 'Virgin' disc signs to be erected either side of the entrance on the George Street frontage. Permanent use of red illumination behind frosted glazing at base of windows on George and Barrack Streets and installation of transparent internal banners to windows.
minor changes to internal partition layouts
New roof skylight structure on Level 11 with associated services and alterations to existing plant room.
Proposed amendment of Condition 18 of consent to permit extended construction hours (Category 2 and 4 hours) to allow up to 24-hour construction, over a 3 month period, associated with the fitout of levels 8, 9 and 10 at the above address.
Fit-out and use of an existing tenancy area, located on level 6 of the building, as an x ray facility with associated office and reception
S96(2) - Modification of swapping of proposed floors plans between levels 9 &10
Internal alterations including office fitout at levels 8,9 and 10, refurbishment works and new internal inter-tenancy stairs.