Applications ordered newest to oldest.
Removal of existing doors connecting two buildings and replace with wall on Levels 8, 9 and 10.
Re-notification of amended plans - Staged construction and occupation to enable a temporary substation at 4-6 York Street whilst the existing substation is decommissioned and replaced, demolition of existing structures, excavation and construction of a 13-storey mixed use development comprising of retail, commercial and entertainment uses on 4-6 York Street. Alterations and additions are also proposed on 341 George Street.
The proposal constitutes Integrated Development under the Heritage Act 1977 requiring approval from Heritage NSW.
Integrated development for the construction of a 13 storey office building at 4-6 York Street. Proposal also includes additions and alterations to 341 George Street. The proposal is integrated development under the Heritage Act 1977.
Section 96(1A) modification of the approved development to modify Condition 1 to reflect changes to the content of two of the approved projecting wall signs.
Section 96(2) modification of the approved development to amend Condition 12 (Hours of Work and Noise) to allow extended construction hours for internal alterations to the existing Westpac Bank to occur between 7.00am and 2.00am the following day Monday to Friday, inclusive. Approved hours of construction work and noise on Saturdays remain the same.
Section 96(2) modification of the approved development to amend Condition 10 (Hours of Work and Noise) to allow extended construction hours for the replacement of the existing business identification signage to occur between 7.00am and 2.00am the following day Monday to Friday, inclusive. Approved hours of construction work and noise on Saturdays remain the same.
Internal Office fitout with plasterboard walls.
Installation of telecommunications infrastructure including underground housing, underground conduit or cable, underground lead in cable, above ground housing.
Replacement of existing signage with illuminated business identification signage.
Internal alterations to Westpac Bank including demolition of non-original elements, internal fitout works, service counters, and internal signage.
Internal fitout to commerical tenancy suite 6A and 6B (Area 9).
Modifications and alterations to existing office fitout to level 8
Interior fitout for medical consulting rooms with hours of operation of 8.00am - 6.00pm Monday to Friday.
Erection of an internal wall to create a meeting room within Suite 7 on Level 1
Office fitout to levels 2, 3(part), 6 and 7
Installation of new internal partition wall on level 3 and removal of existing pin board wall to expose a bank of lifts
Internal office fitout within level 9 of the existing commercial office building.
Internal office fitout within Level 9 of the existing commercial office building.
Construction of internal partitions to form meeting room within suite 2 on level 1 of the Westpac bank building.
Internal office fitout on level 1.
Reinstate non-illuminated 'Westpac' signage on George Street (1 wall plaque and 1 projecting wall sign) and Wynyard Street (1 projecting wall sign).
Internal fitout of level 6 to 8 and use as meeting rooms/offices and work station.
Proposed fit out and use of levels 4 and 5 for commercial offices including meeting rooms, offices and workstation areas.
Level 3 commerical office fitout for architectural and planning practice
S96(1A) modification application for changes to the ground and mezzanine level to reflect NSW Heritage Council s60 and s65A approvals and modifications to condition 9 and 11 relating to the signage strategy and heritage interpretation strategy respectively.
S96(1A) to allow approved building real estate signage to be relocated on hoarding
Two real estate signs for a maximum period of 18 months.
Sect 96 (1a) changes to wording and conditions aswell as minor alterations to plans
Integrated development for internal refurbishment of ground and mezzanine levels of banking chambers.
Conservation, refurbishment & adaptive re-use of the Westpac Bank building for use as retail (part ground floor) & commercial (upper levels) including BCA upgrade works & an award of heritage floor space to the site.
Replacement and installation of two (2) illuminated - horizontal projecting wall signs.