Applications ordered newest to oldest.
Fitout and use of a cafe located in tenancy 2.041 & 2.042 in a Local Heritage Item known as 1-7 Broadway. Proposed hours of operation are 9am to 5pm daily.
Alterations and business identification signage.
Haul approx 25m optic fibre cable to level 2
Use of 13 Broadway as a food and drink premise known as 'Gotcha Fresh Tea' and associated works including fit-out and signage.
Erection of two illuminated signs to the north and south facades of UTS Central Building 2.
S4.55(1A) - Modification of consent to include a new air intake vent adjacent to the Alumni Green to service the Library Retrieval System
S4.55 (1) modification of consent for alterations and additions to UTS building. Proposed changes include the insertion of Council's OSD condition, omitted from original consent.
Alterations and additions to Building CB04 within the UTS Broadway Campus, including the construction of an 8 storey infill building with a basement level for additional laboratory spaces.
S.96(2) application to modify the existing consent for the erection of temporary and illuminated signs to the sides of 2 tower cranes (4 signs) that will be used for the duration of construction activities within the site. The proposal involves deleting conditions 3(b) and 3(c) to permit the approved signs to be illuminated between sunset and 12.00 midnight for the duration of the construction works.
Alterations and additions to Building CB04 within the UTS Campus including demolition of existing University Hall and construction of an 8 storey building with basement and roof plant, new connection between Harris Street to Alumni Green and new connection to Building CB01 on Level 2, and external facade treatments to the southern and western elevations.
Erection of 4 temporary and illuminated signs to the sides of 2 tower cranes that will be used for the duration of construction activities within the site
Alterations and additions to the external facade of the Chancellery building on Levels 4A and 4B.
Bon Marche Building 03 - Street Level Awning
Erection of 4 illuminated 'UTS' signs.
Wayfinding directional signage for the University of Technology Sydney (UTS) including freestanding 'totem' signs, wall signs and awning fascia signs.
Installation of new frameless glass entry shopfront with automatic sliding glass door for the ground floor of Building 3 "Bon Marche" (UTS) fronting Harris Street.
Removal of eight trees and minor structures and the provision of new landscaping to Alumni Green, within the centre of the UTS Campus. Approval is also sought for stormwater works, and the use of Alumi Green for University events.
Internal fit out dance hall and educational establishment associated with the Australian Institute of Music trading 6.00am to 10.00pm, 7 days a week for a maximum of 100 persons and associated signage.
New window and door opening to existing wall on south side of Level 6 of Tower 1, UTS.
S96(1A) modification to change 'external finish 3' from copper to composite panel and reduce skylights in height.
Vinyl signage on the windows on 3 levels of building for 2SER radio station.
Interior alterations to UTS Building 1 (tower) level 2 basement, and Building 4 (Science faculty, corner Harris and Thomas Streets) level 7, to provide more laboratory facilties for anatomy classes.
Upgrade of UTS Building 1 tower core including improved access, and new and refurbished amenities.
Demolition of the western vehicle ramp and changes to the eastern vehicle ramp which provide access between Thomas Street and the basement carpark of University of Technology Sydney.
Temporary, non-commercial art installations on construction hoardings for the University of Technology Sydney.
Refurbishment of the University of Technology Sydney 'Great Hall' located in Building 1 including new finishes, services, store room and foyer space.
S96(1A) Amend the approved plans demoonstrating the location of the Place of Public Entertainment on Level 3 of the Tower Building 1 and Amend condtion No.2 to reflect changes to both the Local Government Act 1993 and the Environmental Planning and Assessment Act 1979
New enclosed accessible ramp structure on the south side of building 04 of the UTS campus.
University of Technology Sydney City Campus: Demolition of building 7 to provide for open space, landscape work and fencing.
To Relocate the existing identification free standing sign at the entrance to the U.T.S. on the Harris Street frontage displaying the words "U.T.S. FACULTY OF SCIENCE plus logo.
S96 (1A) amendment to cafe operation hours to 7am - 9pm Monday to Friday, orinally approved from 9am - 6pm
Fitout of Shop No. 01.20 on level 6 (Harris Street frontage) and use as a cafe.
Relocate glazed entry facade to increase internal lobby area, demolish internal walls of existing office and replace external glazed doorway with fixed glazing
s96(1a) Minor modifications to roof and external works updated
S96 (1A) Modification of condition 2 to extend hours of operation.
The section 96 (1A) seeks to modify replacement of existing louvred doors & provision of addition louvers to existing sub-station, and change of use of general teaching spaces on levels 3 & 4 to academic student rooms