Applications ordered newest to oldest.
Installation of new frameless glass entry shopfront with automatic sliding glass door for the ground floor of Building 3 "Bon Marche" (UTS) fronting Harris Street.
Removal of eight trees and minor structures and the provision of new landscaping to Alumni Green, within the centre of the UTS Campus. Approval is also sought for stormwater works, and the use of Alumi Green for University events.
New window and door opening to existing wall on south side of Level 6 of Tower 1, UTS.
S96(1A) modification to change 'external finish 3' from copper to composite panel and reduce skylights in height.
Interior alterations to UTS Building 1 (tower) level 2 basement, and Building 4 (Science faculty, corner Harris and Thomas Streets) level 7, to provide more laboratory facilties for anatomy classes.
Upgrade of UTS Building 1 tower core including improved access, and new and refurbished amenities.
Demolition of the western vehicle ramp and changes to the eastern vehicle ramp which provide access between Thomas Street and the basement carpark of University of Technology Sydney.
Temporary, non-commercial art installations on construction hoardings for the University of Technology Sydney.
Refurbishment of the University of Technology Sydney 'Great Hall' located in Building 1 including new finishes, services, store room and foyer space.
S96(1A) Amend the approved plans demoonstrating the location of the Place of Public Entertainment on Level 3 of the Tower Building 1 and Amend condtion No.2 to reflect changes to both the Local Government Act 1993 and the Environmental Planning and Assessment Act 1979
New enclosed accessible ramp structure on the south side of building 04 of the UTS campus.
To Relocate the existing identification free standing sign at the entrance to the U.T.S. on the Harris Street frontage displaying the words "U.T.S. FACULTY OF SCIENCE plus logo.
S96 (1A) amendment to cafe operation hours to 7am - 9pm Monday to Friday, orinally approved from 9am - 6pm
Fitout of Shop No. 01.20 on level 6 (Harris Street frontage) and use as a cafe.
Relocate glazed entry facade to increase internal lobby area, demolish internal walls of existing office and replace external glazed doorway with fixed glazing
s96(1a) Minor modifications to roof and external works updated
S96 (1A) Modification of condition 2 to extend hours of operation.
Two buiding identification signs for the University of Technology, 1 sign reads "UTS" the other "Science Faculty" (Building 4).
The section 96 (1A) seeks to modify replacement of existing louvred doors & provision of addition louvers to existing sub-station, and change of use of general teaching spaces on levels 3 & 4 to academic student rooms