S4.55(2) - Modification of consent to obtain approval for an additional date (Thursday 20 March 2025) for Wharf4Ward event at Woolloomooloo Wharf.
Substructure repairs to the Finger Wharf, replace end of life fabric, reinstating missing or loose elements, and removal of redundant services.
Non structural repairs to the wharf substructure
Repair works to 2 gantry cranes
Repairs to wharf substructure. Replace end of life fabric, reinstating missing or loose elements, removal of redundant services.
S4.55(1A) - Modification of Condition (2) to amend event date.
Structural repairs and maintenance to two gantry cranes. This application is Integrated Development requiring approval from Heritage NSW (or their delegates) under the Heritage Act 1977.
Replace existing timber trims on south facade above ground floor windows with new hardwood trims to match existing. Existing timber trims date from the 1990s adaptive reuse and are prone to damage by cockatoo attack.
Replace existing timber trims on south facade above ground floor windows with new hardwood trims to match existing. Existing timber trims date from the 1990s adaptive reuse and are prone to damage by cockatoo attack.
Installation of portable shade umbrella on outdoor terrace of Unit 104.
Replace existing timber trims on south facade above ground floor windows with FC trims to match existing. Existing timber trims date from the 1990s adaptive reuse and are prone to damage by cockatoo attack.
Repair of the travelling gangways (gantries)
S4.55 (2) Modification of consent to amend condition 2 to change the dates of the event from 21 October 2022 to 16 March 2023 and 26 October 2023 to 14 March 2024.
PAN-155584 S4.55 (1A) Modification of consent
PAN-110605
S4.55(1A) - Modification
PAN-109000 - Alterations to mixed use development.
Minor internal alterations and repaint internal common area
New service bar China Doll
Painting internal common areas to Whrfs 7 & 8.
S60 - to undertake repair works to the exterior of the Woolloomooloo Finger Wharf.
Use of the Woolloomooloo Finger Wharf for the Sony Foundation's 'Wharf4Ward' charity event on 24 October 2019, 23 October 2020, 22 October 2021, 21 October 2022 and 26 October 2023.
Section 4.55 (1A) to extend the Wharf4Ward event and bump in and bump out by an extra 30 minutes.
Section 96(1a) modification of consent to change the date of approved event from 20 October 2016 to 27 October 2016.
S96(1A) to modify condition 5 to replace the approved Plan of Management. The amended Plan of Management reflects that approved under D/2014/1949.
S96(1A) - Remove reference to new bar/DJ room, update plan numbers, delete Condition 3.
Proposed erection of temporary structures on Woolloomooloo Finger Wharf for the Sony Foundation's 'Wharf4Ward' charity event on 22 October 2015, 20 October 2016, 19 October 2017 and 18 October 2018 operating between 12.00 noon and 4.00pm. The event will have a capacity of 900 guests and is in association with six restaurants permanently located on the western side of the wharf.
Integrated Development for hotel signage, lighting and associated works to the main building entry of Woolloomooloo Finger Wharf.
Refurbishment within various levels of the existing hotel (licensed) within the Woolloomooloo Finger wharf, including alterations and renovations to the existing conference rooms, swimming pool/gymnasium, entry foyer, back of house areas, the administration/office areas and lounge/reception areas which will include a new bar location with DJ booth above.
The application is Integrated Development requiring the approval of the NSW Heritage Council under the Heritage Act 1977.
Refurbishment of the public spaces and guest rooms of the existing hotel within the Woolloomooloo Finger Wharf.
Hotel signage and associated works to the main building entry on Cowper Wharf Road.
S96(1) modification of consent for demolition and re-build of the Cowper Wharf Roadway seawall. Proposed change is to amend the wording of Condition 5 'Structural Engineers Report to be submitted'.
Demolition and re-build of the Cowper Wharf Roadway seawall.
Erection of temporary structures on Woolloomooloo Finger Wharf for the Sony Foundation's 'Wharf 4 Ward' charity event on Thursday 24 October 2013 operating between 12.00 noon and 4.00pm. The event will have a capacity of 950 guests and is in association with six restaurants permanently located on the western side of the Wharf.
Section 96(2) modification to allow the erection of 5 temporary outdoor stages on Woolloomooloo Finger Wharf for the Sony Foundation's 'The Wharf 4 Ward' charity event on 25 October 2012 (previous event was held on 13 October 2011) operating between 12.00 noon and 4.00pm. The event will have a capacity of 900 people and is in association with six restaurants located on the western side of the Wharf.
Erection of 3 temporary outdoor stages on Woolloomooloo Finger Wharf for the Sony Foundation's "The Wharf 4 Ward" charity event on 13 October 2011 operating between 12.00 noon and 4.00pm. The event will have a capacity of 900 people and is in association with six restaurants located on the western side of the Wharf.
Event known as BBQ Madness in conjunction with the Sydney Food and Wine Festival, to be held at the Finger Wharf Woolloomooloo on Saturday 1 October 2011, and temporary stalls located in front of the restaurants participating in this event.
Erection of temporary stage and back of house structures as part of the lunch time charity event "Sony Foundation Wharf 4 Ward 2010".
Use of 'Water Bar' for up to three live entertainment events per year (private functions)
Place of public entertainment renewal for level 2 Finger Wharf.
Integrated application for the refurbishment of the 'Water Bar' within 'Blue Sydney - A Taj Hotel' concourse level.