Applications ordered newest to oldest.
Renewal of outdoor dining on the roadway in association with the 'Mrs Palmer Sandwich' food and drink premises.
Renew your existing on street dining permit
road space dining
Renewal of use public land for outdoor dining. Proposed hours are 11.00am to 2.30pm Mondays and 11.00am to 12.00am Tuesday to Friday and 5.00pm to 12.00am Saturdays.
Use public land for outdoor dining. Proposed hours are 11.00am to 2.30pm Mondays and 11.00am to 12.00am Tuesday to Friday and 5.00pm to 12.00am Saturdays.
PAN-53019 - Alterations to rear of food and drink premises including installation of roller shutter door to enclose waste storage room fronting Chapel Lane.
Use public land for outdoor dining. Proposed hours are 11.00am to 2.30pm Mondays and 11.00am to 12.00am Tuesday to Friday and 5.00pm to 12.00am Saturdays.
Use 7.5sqm of public footway on Stanley Street, Darlinghurst for outdoor dining in association with the premises known as Mrs Palmer Sandwich Pty Ltd
Minor internal upgrade of food premises. Relocation of coffee preparation area and sandwich preparation area. New seating arrangement to existing cafe.
Use public footway on Stanley Street for outdoor seating in association with the licensed 'The Arch Cafe' (3 tables, 9 seats). Proposed hours of use are 7.00am - 10.00pm, Mondays to Sundays inclusive (renewal of previously approved application).
Alterations, fitout and refurbishment of existing approved first floor licensed restaurant including ground level bathroom upgrade.
Use of public footway on Stanley Street for outdoor seating in association with 'The Arch Cafe' (3 tables, 9 chairs and a menu board). Proposed hours of use are 7.00am - 10.00pm, Monday to Sunday inclusive (variation to previously approved application to licence area)
Application to place a menu board and 3 tables and 9 chairs on the footway adjacent to the unlicensed cafe known as The Arch in area of 6 square metres, between the hours of 7:00am and 10:00pm, Monday to Sunday.
Renotification of amended footway application for 'The Arch Cafe' to place 9 chairs and 3 tables on the Stanley Street footway from 7.00am to 10.00pm Monday to Sunday.
Works to the shopfront of "The Arch" cafe located within a heritage-listed building, including removal of existing shopfront windows and signage, reinstatement of front verandah, new folding entry doors, new projecting wall sign, and new canopy awning over footpath.