Applications ordered newest to oldest.
S4.55(1) - Modification to correct a minor error
Construction of roads (kerb-to-kerb), sewer, stormwater and water supply infrastructure, remediation and subdivision. The works are associated with Stage 1 Concept Approval D/2023/724.
Concept Development Applicationl for building envelopes for a mixed-use development comprising nine individual development blocks ranging in height between one and 25 storeys; concept design for public domain works including new streets, public open spaces and trunk drainage; and indicative land uses including basement car parking, storage and services, ground floor retail, commercial uses and a centre-based childcare facility, and residential uses
D/2023/724 - Dedication of land and embellishment for new parks, roads, road widening, through site link and extension of Green Square Trunk Drainage system.
Demolition of existing structures to accommodate future redevelopment.
Planning Proposal - Dual reticulation in buildings for recycled water, a minimum 4% non-residential GFA, exceedance of BASIX targets for water and energy and provision for EV charging capable parking.
Installation of a single demountable office unit within the site in relation to the existing motor vehicle dealership.
Erection of temporary fencing and temporary signage along the Link Road frontage. Display of signage is limited to 4 times per year and 6 days per display
Placement of 14 portable advertising flags associated with the existing motor vehicle dealership during operating hours along the street frontage.
S96(2) - Proposed amendment to existing signage related to the Hyundai Vehicle dealership. Amendments include new proposed 5.8 metre high pylon sign to be attached to southern wall of Hyundai showroom.
Erection of 5 business identification signage for Hyundai Car Dealership.
Relocation of existing 15m pylon sign associated with SMA Motors 65m south of current location, adjacent to the main driveway entry.
Removal of existing Holden fascia signage and replacement with SAAB and Hummer signage.
Installation of fascia wall signs on the northern, southern, western and eastern facades of the existing car dealership building. The text and logo are proposed to be illuminated and the remaining signage will be non-illuminated.