Applications ordered newest to oldest.
Section 96(1a) providing for staged subdivision to occur with approved lot 3 to be subdivided into a further 5 lots
Construction of the Green Square Town Centre Library and Plaza. The works comprise earthworks, remediation and construction and use of a predominantly underground single storey library incorporating an entry triangle with licenced cafe, sunken garden, sunken amphitheatre and a narrow seven storey library tower element. Works also include public domain improvements through the establishment of the public plaza, a shared access zone, signage and public art.
Provision of 2.4m high hoarding and signage along the Botany Road, Bourke Street and Portman Street frontages of the site.
Modify condition 61 to delete requirement for security when council is undertaking works
S96(1a)Division of residue land for future subdivision/residental into 5 lots
Section 96(1A) modification to amend approved street tree species listed at Condition No. 38
Section 96(1a) modification to amend Condition No. 38 to permit the removal of trees for the installation of crossovers.
Erection of a 10 storey mixed use development including basement car parking for 138 vehicles, ground floor retail space and supermarket and two residential towers with 174 residential units.
S96(1A) Inclusion of additional reference plans under condition (1) approved development. Removal of condition (8) Future open space-Drying green and condition (9) Drying green storage basin.
Provision of essential infrastructure for the Green Square Town Centre, including demolition of minor structures and tree removal, construction of new roads and associated infrastructure, concept landscaping and streetscape design, provision of above and below ground services (including stormwater, sewer, water, electrical and telecommunications) and staged construction.
Section 96(1a) to extend current deferred commencement approval due to expire on 24 Novemebr 2010
S96 (1) Modification to extend the "deferred commencement" date by 12 months. No other changes requested.
Town Centre essential infrastructure including the construction of new roads, footpaths and services such as stormwater, sewer, power and telecommunications.
Erection of signage structure.
Full demolition of all buildings and structures on the former Waterloo Incinerator site (including the chimney stack, incinerator building and all underground structures and foundations), removal of the majority of site vegetation, bulk earthworks, grading and stabilising of the site, construction of a water and sediment detention pit and temporary removal and re-injection of ground water.