Applications ordered newest to oldest.
D/2021/319 - Dedication of land and embellishment for footpath widening to Bourke St, an easement for public access for footpath widening to Botany Rd and a monetary contribution of $7,325,587 towards community infrastructure in Green Square.
PAN-86251 Construction of a mixed use development including a two storey commercial podium above the existing approved retail podium and two residential towers containing 255 residential apartments (including 92 dual-key apartments) with associated communal outdoor space and parking. Proposal also includes footpath widening on Bourke Street and Botany Road and land dedication on Bourke Street.
Section 4.55(1A) modification of consent for construction of a 3 storey mixed use development. Proposed changes are to modify condition 13 to refer to an amended Flood Assessment Report.
Section 4.55(1A) modification application to amend condition 16 (Land Contamination) to reflect an updated Remediation Action Plan and Interim Advice Letter
Section 4.55(1A) modification of consent for demolition of existing structures and construction of a 3 storey commercial building. Proposed change includes an amended to RMS condition 109 to allow a right hand vehicular turn in to the development from Wyndham Street.
Section 4.55(2) modification of consent for demolition of existing structures and construction of a 3 storey commercial building. Proposed changes include internal and external building alterations, reconfiguration of internal building layout, increase in building height, increase in gross floor area, change in external building materials, reduction in car and bike parking and modification to staging of demolition and construction works. The application includes associated modifications to conditions 3, 4, 5, 7, 8, 9, 13, 24, 31, 32, 44, 75, 76, 77.
Section 96(1A) to amend Condition 15 (Section 94 Contributions) and Condition 109 (Roads and Maritime Services Conditions).
Section 96(2) to modify the design of the approved retail and commercial development to delete one basement level and reduce car parking; alter vehicle and pedestrian access points; realign building levels; reconfigure tenancies, lobbies, plant and Level 1 commercial space; deletion of level 2; change building facade. Consequential amendment to Conditions 3 (Staged construction), 4 (Approved development), 7 (Floor Space Ratio), 9 (Building height), 11 (Use of retail & commercial tenancies), 13 (Flood Assessment report), 14 (Affordable Housing contribution), 15 (Section 96 contribution), 24 (Car parking spaces and dimensions), 29 (Service vehicles), 30 (Service vehicle size limit), 31 (Bicycle parking) and 32 (Bicycle facilities).
S96 1(A) The application seeks to amend condition 3 to allow the approved signage to stay in place until the 09th March 2016.
Erection of temporary signage.
Section 96(1A) Amend Condition 4 (Approved Development) to reflect the supermarket tenancy fit-out plan; Amend Condition 11 (Use of Retail & Commercial Tenancies) to delete reference to supermarket and approve use and fit-out of Tenancy R.30 as part of the base building development consent; Add new Conditions 11A to 11C relating to the operation of the supermarket use; Amend Condition 20 (Noise - Use) to include use of the supermarket tenancy;
Amend Condition 82 (Mechanical Ventilation) to reflect supermarket use; Add new Conditions 89A to 89F related to the use and operation of the supermarket.
Demolition of existing structures, excavation for 2 basement levels accommodating 327 car parking spaces and construction of a 3-storey retail and commercial development accommodating 11,452.05sqm of floor space.
Use of existing warehouse building for the retailing, warehousing and distribution of Christmas products. Works include non-illuminated signage at the Wyndham Street, Bourke Road and Botany Road elevations.
S95 - Extension of consent.
Section 96 (2) Reconfiguration of all levels of the development including changes to loading dock arrangements, changes to most retail areas, and changes to parapet RL
Condition in part A of consent replace words " 12 months " with "21 months "
DEMOLITION OF EXISTING BUILDINGS AND CONSTRUCTION OF A PART 3/PART 4 STOREY DEVELOPMENT COMPRISING 23,717SQM OF RETAIL SPACE AND 3,686SQM COMMERCIAL SPACE, 4 LEVELS OF BASEMENT PARKING WITH 800 CAR SPACES.
Integrated development application proposing demolition of existing light industrial buildings, amalgamation of 2 lots into one lot with a combined area of 9,134sqm, and construction of a part 3/part 4 storey mixed use building containing 14,949sqm of retail floor area and 10,733sqm of commercial floor area, with 3 levels of basement parking for 614 spaces.