Applications ordered newest to oldest.
Heritage works to repair rusting steel awning
Use public footway on Crown Street for outdoor seating in association with ‘Crown Street Grocer’ (9.9 square metres of area used). Proposed hours of use are 6.00am – 8.00pm Mondays to Sundays inclusive (variation to previously approved application).
Use of the Crown Street footway for outdoor seating in association with the 'Crown St Grocer' (9.9 square metres of area used). The proposed hours of operation are from 7.00am to 8.00pm, 7 days (renewal of previously approved application).
Alterations and additions to existing Youth Hostel including a new roof to cover an existing BBQ courtyard.
Use of the Crown Street footway for 4 tables, 20 chairs and 2 heaters in association with the 'Crown St Grocer'. The proposed hours of operation are from 7.00am to 8.00pm, 7 days.
Alterations and additions to construct a roof over the existing first floor patio on the western side of the Oasis building.
Alterations to existing shopfront known as "Crown Street Grocer" including bi-fold doors and new counter.
Installation of solar panel system to rooftop of Salvation Army Oasis facility. Including approximately 69 PV solar panels with a surface area of less than 50m2, internal cabling, metering and connection to Energy Australia distribution network.
Use of premises as a combined delicatessen, fruit and coffee shop, with four (4) signs associated with the use. Approved hours of operation are as follows: 6am -11pm, Monday to Friday and 6am - 10pm Saturdays and Sundays.
Reduce width and detail of the crisis entrance (Entry #3) on Foveaux Street and change approved floodlit signage to backlit signage boxes.
Alterations and additions to existing crisis accommodation and counselling facility, new entries, internal refurbishment, new retail space off Crown Street, new external finishes and new landscaping.