Applications ordered newest to oldest.
Internal alterations/ fitout to existing commercial office premises
Alterations to office premises on Level 6.
Local heritage exemption for internal alterations on Level 40 Australia Square.
Minor internal alterations to Level 40
Alterations to office premises on level 24 Australia Square
Internal alterations on Levels 25 and 26 and installation of external mechanical louvre on Level 25.
Vivid Sydney - 5-event year approval for the use of land within the City of Sydney for the annual Vivid Sydney Temporary Community Event including installation and operation of temporary structures.
Alterations to office premises, internal fitout works on Level 37.
Internal alterations to Level 24
S4.55(1) - Modification to remove condition 15 in the original consent notice.
Alterations to office premises on Level 17
Alterations to office premises on Level 29
Alterations and additions to existing food and drink premises (Shop 418 - 419A)
Installation of three mechanical louvres at level 30.
S4.55(1A) - Modification of consent for alterations to office premises fitout, levels 7 and 8 Australia Square Tower
Alterations and additions to existing office fitout on level 41.
Alterations to office premises, fitout of Suite 39.03 on Level 39 Australia Square.
Alterations to office premises, fitout of Level 30 Australia Square.
Alterations to office premises, demolition of existing fitout and fitout of Suites 24.02 and 24.03 on Level 24 Australia Square.
Alterations to existing office fitout of suite 18.03 on level 18.
Alterations to use Shop 420 as a takeaway food and drink premises. Proposed trading hours are 9.00am to 5.00pm Monday to Friday, Weekends closed.
Demolition of fitout at Shop 420.
Alterations and/or additions to existing office premises
Alterations to office premises, fitout of level 38 Australia Square.
Alterations to office premises fitout Level 7, 8 & 9 Australia Square
Alterations to office premises fitout Level 30 Australia Square
Alterations to use Shop 403B as a pharmacy and signage
Alterations to office premises fitout Level 45.01 Australia Square
Alterations to use premises as office.
Alterations and additions to commercial development
Alterations and additions to office premises on level 25 & 26.
Section 4.55(1A) modification of consent for internal alterations to Shop 403 on the Ground Level.
Section 4.55(1A) modification of consent for internal alterations to Level 9.
Section 4.55(1A) modification of consent for internal alterations to Level 8.
Section 4.55(1A) modification of consent for internal alterations to Level 6.
Section 4.55(1A) modification of consent for internal alterations to Level 7.
Alterations to use site as take away food and drink premises with sign installation.
Alterations and use of Shop 404 on Level 4 as a food and drink premises.
Alterations to office premises on level 39
Removal of carpet and tiling of floor at L48 lobby
Fitout of existing food and drink premises (Shop 404) as Sinjeon.
Demolition of existing retail tenancy and bring back to ceiling grid and tiles.
Alterations to food and drink premises Shop 411 Australia Square
Suite fitout works for L48.01 and 48.03 in Australia Square Tower
Demolition of existing fit-out and new works to complete new office fit out in Suite 36.04.
Alterations/additions to commercial development infill of private stairs Levels 24 & 25 Australia Square
Internal alterations and additions to Level 9, including demolition of existing office fit-out and construction of new fit-out works
Internal alterations and additions to Level 7, including demolition of existing office fit-out and construction of new fit-out works.
Internal alterations and additions to Level 8, including demolition of existing office premises fit-out and construction of new fitout works.
Alterations to office premises including the installation of 2 (two) phone booths.
Internal alterations and additions to Level 6, including demolition of current office fit-out and construction of new fitout works.
Internal alterations and additions involving demolition of current office fit-out to create new office fit-out.
Alterations to office premises Level 18.01
Section 4.55(1) modification of consent
Section 4.55(1) modification of consent
Alterations to office premises on Level 48.02
Alterations to office premises on Level 44
Alterations and additions to office premises on level 34.
Fitout of existing food and drink premises (Shop 408) as a Boost Juice.
Replacement of delaminating glazed panels to the existing balustrade facing east.
PAN-198913 Alterations to office premises on level 44.
Heritage exemption application for works to suite 22.01. Works include removal of flooring and ceilings in the front enrty section and make good.
PAN-175787 - Alterations to office premises on level 21
Lobby upgrade to Level 21 within the Tower building at Australia Square
PAN-174371
Alterations and additions to commercial development located on Level 20.
PAN-158619 Alterations/additions to commercial development to replace umbrellas
PAN-151537 - S4.55(1A) - Modification of consent to install one new parititon wall on Level 46
PAN-127317 Alterations to office premises
PAN-124226 Alterations to office premises
PAN-120549
Alterations/additions to commercial development located on Level 31.
Heritage works for maintenance at Ryan's Bar at Australia Square
PAN-113425 - Minor internal demolition and new fit-out of existing tenancy on Level 41.
PAN-109964 Alterations and additions to commercial development
PAN-102152
Alterations and additions to Tenancies 36.01 and 36.02 located on Level 36 of the Australia Square tower.
PAN-84928 Office fit-out of Suites 28.02 & 28.03 located on Level 18 of the Australia Square tower.
PAN-82669
Alterations and additions to commercial development located on Level 40 of the Australia Square tower
PAN-84929 – Internal alterations to Suite 32.01 and 32.02 for existing office premises.
PAN-82054 - Alterations/additions to office premises.
PAN-66445
Section 4.55(2) Modification of Condition 68 to renew the trial trading hours of the outdoor area between midnight to 2.00am, 7 days a week and Condition 79 to renew the use of outdoor speakers between 10.00pm to 12.00 midnight, 7 days a week under a trial period.
PAN-58591- Office fit-out of Suite 18.03 located on Level 18 of the Australia Square tower
PAN-49220 - Alterations to office premises
PAN-49213 Alterations/additions to commercial development
PAN-45926
Office premises
PAN-40130 - Section 4.55(1A) modification of consent
Removal of existing ATM machine.
PAN-34160 - Alterations and additions to commercial development
PAN-33660 - Alterations and additions to commercial development
PAN - 24277 - Alterations and additions to commercial development, located on Level 18 of the Australia Square tower
PAN-21536 - Alterations and additions to a commercial development, located in Basement Levels 2 and 3
PAN - 21377 - Alterations/additions to commercial development, located on Level 24 of the Australia Square tower.
Internal alterations to Level 36 of Australia Square to combine tenancies 36.01 and 36.02 into one tenancy.
Internal alterations to Level 28 of Australia Square to remove the existing office fit-out in order to return Level 28 to its original base building layout.
Alterations and additions to the northern end of the upper plaza (level 5) of Australia Square comprising the construction, use and fit-out of a new licensed food and beverage kiosk. Other works include relocation of existing tree planters, umbrellas, tables and chairs, new seating and signage.
Internal alterations to Level 40 of Australia Square Tower.
Proposed internal alterations to non-structural partition walls in existing office suite on Level 18
Internal alterations to Tenancy 2 on Level 48 of Australia Square.
Minor internal alterations to existing fit out of level 48 Australia Square Tower
Internal alterations to Tenancy 3 on Level 40 of Australia Square to create new rooms and work spaces.
Internal alterations to parts of Level 21 of Australia Square to create new office spaces for Littlewoods Services.
Minor internal modifications to Level 37 of Australia Square
Internal alterations to existing tenancies on Level 17 and Level 20 of Australia Square
Redecoration of the Level 38 Lobby including new floor, wall and ceiling linings, light fittings and internal signage.
Internal commercial office fit-out to Suite 1 on Level 39 of Australia Square Tower.
Alteration of existing Office and Fitout of new office tenancy on level 27 and 40.
Internal reconfiguration and office fit-out to level 38 (tenancy 38.03).
Internal commercial office fit-out to Suite 2 on Level 45 of Australia Square Tower.
Section 4.55(2) modification of consent to create two new enclosed offices with glazing, two offices separated by dividers and relocate joinery.
De-fit existing office on Level 18 (Suite 05) and undertake new fit-out.
Level 42 - De-fit entire floor and fit-out of new tenancies, upgrade of lift lobby common area.
Level 43 - De-fit entire floor and fit-out of new tenancies, upgrade of lift lobby common area.
Whole of Level 16 - removal of existing partitions and fit-out for new offices and reception area
Internal alterations to existing food and drink premises Shop 410 of the Australia Square commercial office building.
Internal alterations to Level 34 of the Australia Square Building including removal of meeting room walls and replacement with framed glass wall and associated glazing.
Installation & operation of Building Illuminati component (including building lighting and sculpture trusses) of the Vivid Light Walk within The Rocks and West Circular Quay, East Circular Quay & CBD Event Precincts & other locations within the CBD north area in accordance with the event plan of management for five ‘event’ years from 2019.
Alterations to Level 32 Lobby of Australia Square building including new floor, wall and ceiling linings, light fittings and internal wayfinding signage.
Partial repainting of internal walls,partial replacement of carpet tiles,partial replacement of workstations.Painting involving walls along the south end of its L38 tenancy,carpets and workstations.
Internal alterations to Suite 17.09 (Level 17) of the Australia Square Building including removal of existing partition walls and fittings, and construction of new partition walls and office entrance.
Internal alterations to Suite 32.05 (Level 32) of the Australia Square commercial office building to make minor modifications to the existing office fitout and add partitions to create a new office space.
Minor modifications to existing office fitout on level 37 - adding partitions to create a new office.
Section 4.55(2) modification to licensed premises also known as Ryan's Bar to continue extended outdoor trading between 8.00am and 2.00am, 7 days a week. Proposal also seeks to extend trial relating to outdoor speakers and music between 10.00pm and midnight.
Internal alterations to Suite 20.01 and 20.07 of Australia Square Tower including demolition of internal walls for new office fit out to create two new tenancies.
Like for like replacement of the pavers/tiles to the external stairs between the tower podium and the main plaza level. If required, minor alterations to the associated handrails.
Internal alterations to Suites 20.03 and 20.05 for office fitout.
Internal fitout works for the purpose of an office premise on level 34 of Australia Square Tower.
Office fitout of existing tenancy 3202
Construct a new commercial office fitout on level 41
Internal fitout works for the purpose of an office premise on Level 46 of Australia Square Tower
Office fitout of existing tenancy 4501 to create two(2) new tenancies
Internal alterations to level 18 of Australia Square involving the demolition of existing partitions and construction of new partitions.
Internal alterations to Level 17 of Australia Square Tower.
Office fitout on Level 17
De-fit of existing office fitout on Level 39
Internal fitout of suite on level 41 at Australia Square
Alterations to Level 45 to split the level into three separate tenancies and to install a new office fitout to two suites (Suites 4502 and 4503), removal and infill of stairs connecting Levels 45 and 46 and make good the third suite for future fitout (Suite 4501). Proposed hours of use are between 7.00am and 7.00pm Monday to Friday, inclusive.
Level 44 office fit out to create separate tenancy suites
Installation of security cameras in the ground floor plaza level as well as retail spaces.
Remove existing signage. Install digital signage and install seating. Australia Square Pitt St lobby.
De-fit of existing office and construction of a new office fit out to include new plasterboard walls and new glazed walls and doors on Level 21
Modifications to existing office space, removal of existing lightweight partitioning and new workstations and loose furniture
De-fit of existing office fitout and re-instate tenancy back to open plan office space on Level 41
Removal of existing office fitout and construction of new office fitout on level 17.
Minor modifications and fitout to existing office suite on Level 21
Minor partitions, modifications and fitout works to existing office suite
Alterations and fitout works to existing office suite on Level 37
Internal alterations to Level 17 of Australia Square Tower.
Section 96(2) modification of consent for alterations and additions to the upper plaza level of Australia Square in association with a new licenced café. Proposed amendments include the retention of existing concrete bench to the northern boundary and the removal and reconfiguration of approved concrete seating and landscape elements.
Section 96(2) modification of consent for new pavilion structure for a licenced café, at the upper plaza level of Australia Square. Proposed amendments include change of material used for internal walls and partitions, the addition of outdoor umbrellas, a revised furniture layout and changes to the approved concrete bench on the southern boundary.
Internal alterations to levels 36 and 37 including upgrades to the lift lobby, pre fit out works and in fill an interconnecting stair between the two levels.
Demolition of a partition wall & construction of a new partition wall & new doors.
Section 96(2) modification to licensed premises also known as Ryan's Bar to continue extended indoor trading hours for 24 hours, 7 days a week and outdoor trading between 8.00am and 2.00am, 7 days a week. The proposal also seeks to use speakers and music in the outdoor area up to 12.00 midnight, 7 days a week, and implementation of a new Plan of Management.
Minor internal alterations and additions to existing tenancy
Alterations and additions to existing commercial tenancy
Proposed alterations to existing office partitions on Level 18
S96(1) Correction of error in condition 11A of development approval relating to maximum capacity of staff and patrons.
Internal alterations to part level 39, Australia Square Tower to create two new suites.
Internal alterations to level 2, Australia Square Plaza.
Additions to the level 3 basement ramp of Australia Square for a new steel platform structure partly over the driveway to accomodate mechanical plant . Relocation and alteration of existing signage above the roller door on level 3 basement ramp.
Installation of photo artwork to temporary construction hoarding adjacent to Curtin Place.
Internal works to existing office on Level 22 of the Australia Square Building.
Commercial office fit-out of Level 24
Section 96(2) modification of consent to extend the approved hours of operation of the licensed restaurant to between 6.00am and 12.00midnight Monday to Sunday, inclusive. Other proposed modifications include alterations to the internal dining and kitchen configuration, changes to mechanical ventilation and the addition of signage. The premises has a proposed patron capacity of 100 persons.
Section 96 (1A) modification of the approved development to amend the location of the car park office to Level 2 basement and retain the previously approved office on Level 3 basement as a bicycle storage area. Also the deletion of condition 2 in relation to the provision of ‘swept path diagrams’.
Internal office fitout to part of Level 32
Installation of telecommunications infrastructure including underground housing, underground conduit or cable, underground lead in cable, above ground housing.
Demolition of existing end of journey facilities and removal of five car parking spaces to allow for the construction of new end of journey facilities in basement 3.
Demolition and internal fit out works of food court tenancies 402, 404, 406, 408, 413, 419, 420, 421, 422, including upgrades to tenancy layouts, counters, and kitchen areas.
Internal alterations to Level 28 of commercial office building to remove and create new office partitions and layout.
Internal alterations to Level 27 of commercial office building to create new office partitions and layout.
Alterations and additions to level 27 existing office suite 1 and tenancy split creating new office space.
Internal office fitout to level 40 of 'Australia Square'.
Minor internal alterations to create new sub tenancy. Works consist of the removal of a partition wall, the installation of a partition wall, installation of power to the wall, and painting.
S96 1(a) - Modification of condition 3 (a) (vi) relating to smoke hazard management
Deletion of conditions 4 & 12 relating to ventilation requirements
Internal office fitout to tenancy 2001A on level 20 of 'Australia Square'.
Section 96(2) modification of consent for internal fit-out works of food court tenancies within Australia Square (level 4). Proposal is to amend Condition 18 (Hours of Work and Noise) to allow extended construction hours to occur 24 hours a day, 7 days per week.
Proposed demolition and internal fit-out works of food court tenancies 407, 410, 411, 412, 418 & 419A, 423, 424, 425 including refurbishment works of the existing core thoroughfare with new lights, painting of walls and ceiling and new floor finish.New sliding doors at the north-eastern entrance to the foodcourt and replacement of roller doors.
Sect 96 (1A) - Change to location of services in the approved dropped ceiling. Requires amendment to condition 1 to reflect new plan.
Internal alterations at Level 39 of Australia Square Tower
Internal office fitout at Level 40 of Australia Square Tower
Internal alterations to Level 6 and 7 of Australia Square in association with airlock works.
Alterations and additions to Australia Square including construction of a pavilion structure at the upper plaza level for a cafe, alterations to an existing staircase, alterations to lift access, and an upgrade to public seating at the upper plaza level.
Internal alterations to an existing office on Level 32 of Australia Square to create an additional tenancy and new office layout.
Internal alterations to Level 30 of Australia Square office tower to create new office layout.
Internal alterations to existing office on Level 31 of Australia Square including fit out and the erection of partition walls to create new offices.
Section 96 (1A) modification of consent. Proposed changes include the demolition and reinstatement of internal partitioning located on level 31 of 'Australia Square'.
Demolition of internal partitioning and a makegood of suite 31.01 and 31.02 installation of two tenancy walls and the creation of three suites to become 31.01 , 31.03 , 31.04 and 31.02 on 31st floor.
Fitout of a portion of Level 23 of an existing commercial building as an office including internal partitioning.
Internal office fitout to level 24 of 'Australia Square'.
Section 96(1A) modification of consent to amend office partitions on Level 18.
Internal alterations to existing office on Level 39 of 'Australia Square' including the erection of partition walls to create two new offices.
S96(1A) - Additional wall and door
Internal alterations to existing office on Level 6 of 'Australia Square' including the erection of partition walls to create a new office.
Alterations to level 39, 'Australia Square' including the construction of one partition wall.
Internal office fitout to level 16 of 'Australia Square'.
Internal alterations to existing office on Level 32 of 'Australia Square' including the refurbishment of reception area and the erection of partition walls to create a meeting room and two new offices.
Internal office fitout to suite 3, level 38 of Australia Square Building.
Internal alterations and fit out of new office space on Level 39 of 'Australia Square' including the erection of glazed and plasterboard partition walls to create an office, meeting room and reception.
Internal alterations to existing office on Level 48 of 'Australia Square' including the erection of plasterboard partition walls to create offices and meeting rooms and the installation of plasterboard ceiling.
Internal office fitout to suite 18.06, level 18 of 'Australia Square'.
Internal alterations to Level 18 of Australia Square including the demolition of existing partition walls and the erection of new glazed and plasterboard partitions.
Internal alterations to existing tenancy and new fit out of adjacent tenancy on Level 38 of Australia Square including internal partitions for new offices, new shower, lockers and installation of workstations.
Fitout of Level 23, Australia Square
Internal alterations to existing 'Sunsuper' tenancy on Level 29 of Australia Square including demolition of existing fitout. Installation of new work desks, partitions, meeting rooms and furniture.
Alterations to existing vacant office suite on level 38 to create 2 new tenancies - 38.03 & 38.02.
Internal alterations to existing 'Rolex' tenancy on Level 39 of Australia Square including reception area fitout and new internal partitions
Construction of a new display office fitout to level 13 suite 1303 comprising of partitions and furniture .
Construction of a new display office fitout to level 41 suites 2 & 4, comprising of partitions and furniture. Subdivision of the existing vacant tenancy to create suites 2 & 4.
Construction of a new display office fitout to level 18 suite 1806 comprising of partitions and furniture .
Construction of a new display office fitout to level 39 suite 4 comprising of partitions and furniture .
Office fit-out works to half of Level 24 & interconnecting staircase between levels 24 and 25
Internal modifications to the south-western quarter of an existing office on level 48 including partial demolition, partitions, fixtures, finishes and building services. New sliding door to south-eastern tenancy.
Internal Modifications of existing office area on Level 48 to convert a single tenancy (leasehold) into space suitable for two separate tenancies.
Level 22 fitout of offices.
Minor internal alterations to Level 24 including new inter-tenancy walls and access doors and fitout of one of the tenancies. The fitout includes two new offices, meeting rooms, store rooms and kitchenette
Section 96(2) modification of consent to amend the approved outdoor trading hours of the licensed restaurant at Shop 413.
Internal alterations to Level 21 of commercial office building.
Minor internal alterations and upgrade works to Levels 6, 7, 8 and 9 of existing commercial office, Australia Square (Tower).
Fitout of Levels 11,12 and 13 for commercial office use including internal partitioning.
Create new tenancy "Suite 2007" and carry out minor alterations to suite 2002.
Internal office fitout (suite 2007).
Use of Shop 413 Australia Square as licensed restaurant.
Office fit-out to Levels 10 & 14.
Internal office fitout of Level 15
Removal of existing external signage and replacement with nine new wall signs including building identification signs, directional signs, and buisness identification signs.
Internal alterations to Suite No. 38.03 to revert tenancy to original conditions.
Fitout and use Bays 13-15 on Level 18 for commercial offices
Internal fit out of Suite No. 18.08 and use as an office.
internal Office Fitout to Level 31 of Tower Building.
Removal of existing office fitout at Level 23 Australia Square and create open plan layout.
Fitout and use part of Level 39 for commercial offices
New parition wall and door to create new tenancy.(LEVEL 18)
Tenancy subdivision of suite 18.10 and creation of suite 18.08 and suite 1809 refurbishment of both new tenancies level 18.
Returning tenancy back to base building standards and installation of partitions on Level 39.
Demolition of the existing fitout of Suite 4102, lighting upgrade and compliance modifications.
Fitout of Tenanacy 01 on Level 22 as a commercial office
Internal office fitout to part of Level 22.
Minor modifications to existing office fitout on level 30.
Office fitout of tenancy on part of level 17
Part internal fitout to existing offices level 41.
Internal upgrade to Level 4 Food Court consisting of installation of new dropped ceiling to main circulation area, glass directional signage, new ceiling services and new colour glass backed wall to enclose ATMs.
Internal fitout to existing offices on level 39.
S96 (1A) Change of partition lay-out and change of tenancy location.
Internal fitout of commercial office on Level 20.
Level 20 - consultancy office for Neurosurgeon. Fitout consists of one office and one reception/waiting area.
Level 18 - Commericial fitout of tenancy including reception foyer, meeting room, boardroom, open work area, office, kitchen and storage. There are no demolition work or external alterations.
S96 (1A) Additional DDA bathroom to Level 25
Internal office fit-out of part of Level 21.
Plaza Lvel 2, 3rd tenant split, Constuction of intertencancy wall with doors and hardware
Demolition of existing internal fit out on part of Level 17 and revert to back to base building layout.
Level 17: Internal office fitout including new full height partitions plus doors, loose furniture items plus minor works to mechanical/electrical services.
Office fitout works to Level 25 & 26 including new steel-frame interconnecting stairs.
S96 (1A) Schedule 1, item (1) change in drawing revision.
Demolition of internal office fitout of Suite 2004 on Level 20
Demolition of existing internal fit-out on part of Level 18 and revert to back to base building lay out.
Internal fitout to level 2 and create two office tenancies
S96 (2) application to extend the construction hours for internal work to 24 hours a day, seven days a week.
Internal alterations to Level 46.
Changes to office partitions within parts of Level 18
Demolition of internal partitions to create a meeting room on Level 9
Internal office fit out to part of level 40.
Construction of an office suite for display purposes. The works include a communication/service room, new kitchen, open plan workstation area, ultilies storage, a meeting room and a waiting area.
New wall and PVC swing door to garbage area, checker plates in the internal corridor, and removal of bump rails to level 3.
Internal Fit out to the existing offices on part level 27.
Office fitout of level 22 for a demonstration suite.
Voluntary Disability Discrimination Act 1992 (DDA) upgrade of base building toilet facilities along with an overall DDA upgrade concept applying to common areas.
Alterations to the existing office, partitions and furniture modifications within Bays 1-4 & 20 on Level 28
Sec 96 addition of bollard and tactile indicators & revision of footpath transition ramp layout and surface material
Internal alteration to officers and workstations within commercial office on Level 44.
Internal partitions to the existing office suites on levels 24, 25, 26 of Australia Square
New partitions to existing office Lvl 17 suite 14
Fitout and use Shop 420 as a takeaway kebab shop
Removal of existing internal office fitout to Level 13 of the Plaza Building and adjust all essential fire services to open plan
Level 24- Make good works to Australia Square
Alterations to vehicular entry ramp, and demolish paystation and changerooms on Level 3
Continued late night operation of licensed premises known as Ryans Bar. Proposed hours of operation: 24 hours internally and between 8.00am and 2.00am, the following day in the external areas of premises; 7 days.
Divide a single meeting room into two smaller rooms.
To project image of junior masterchef kids from Australia square to suncorp building for 1 hour on the 17 of August 2011.
Internal refurbishment to commercial office on L22
Removal of partitions on Level 9 and installation of new work stations.
Construction of internal partitions on Level 39.
Temporary video projection onto the upper facade of the Suncorp building, (projected from Australia Square).
s96 1(a) Amendment of open meeting room to enclosed room on level 37, with minor modification to local services to suit BCA regulations.
Internal Office fitout alterations (partitioning alterations) within Level 21 including alterations to essential services.
Projection of images from Australia Square to the Suncorp builing.
Use of Suite 2005 within Level 20 as an administrative office for a wine wholesaler (KINGSVIN WINES)
Internal fitout to the existing offices on level 18
Internal fitout to the existing offices on part levels 24 and 41 and continue to use as offices.
Reconfiguration of existing office layout on part level 41 with associated relocation of existing services such as sprinkler/fire systems.
Fitout to the existing offices on part level 33 and continue to use as offices.
Fitout to existing office on Level 20 and continue to use as offices.
s96(1A) Adjustment to geometry of proposed stair from spiral to rectilinear.
Fitout to the existing offices on part level 21 and continue to use as offices.
Commercial fit-out of levels 36 and 37 and construction of a staircase connecting the two floors. The building is known as Australia Square Tower.
Demolish existing office fitout (Chubb Insurance) on levels 36, 37 and part of 40 and retain the commercial use of the premises.
Fit-out works for Level 36 as the above address.
Fit-out and use shop 402 within the Australia Square Gourmet Circle as a Cafe Shop.
Fitout and use Tenancy No. 405 within the Australia Square food court as a juice station.
Section 96 (1a) Add additional louvre to levels 14 & 19
Section 96(1A) Schedule 1F clause 72 wording changed
Internal office fit-out of Suite 03 on Level 38 at the Australia Square Tower Building including reception, meeting rooms, tea room and the open plan office area.
Classification of the existing Ryans Bar (Shop No. 26) and the adjoining outdoor area (Shop No. 26A) currently used by the bar as a Place of Public Entertainment (P.O.P.E.)
Refurbishment of existing Bar. Refurbishment includes all services to the existing bar and new basement level housing amenities, staff amenities and back of house facilities.
Minor facade glazing alterations to install discharge louvres and related internal fitout within Level 14 to provide an in-house kitchen for the law firm occupants of Levels 10-14.
Internal fit-out of shop 421 within the fourtcourt at Australia Square and use as vegetarian take-away (Macro Cafe).