Alterations and additions to lower level 3 courtyard at the rear of the Art Gallery Naala Nura South Building and minor landscaping works within the adjoining area of The Domain.
Public domain works in Shakespeare Place and Macquarie Street including landscaping, accessibility upgrades, public art, road realignment, construction of a kiosk and signage. The application also seeks consent to hold events for a maximum of 1,500 people six times per year. The application is Integrated Development requiring the approval the Heritage Act 1977 and the Roads Act 1993.
Conservation and maintenance works to the Domain Lodge, Sheds and Gate Piers
Maintenance and repair works to the Frazer Memorial Fountain.
Use of various sites within the Macquarie Street East Precinct (Macquarie Street, Hyde Park Barracks, The Mint, Sydney Hospital, The Domain and State Library) for 'MOPOKE' being a 24-hour temporary arts and culture festival, involving art installations, interactive art works, lectures/workshops, outdoor silent cinema and seating areas, food trucks and pop up bars, market stalls, lounge areas and temporary toilets. The event is proposed to take place from 6pm on Saturday 4 February 2023 to 6pm on Sunday 5 February 2023.
PAN-24824 - S4.55 (2) Modification of consent to continue performances until 2023
S4.55(1) modification of the consent to correct a council error by amending the wording in the reason for approval to be ‘RE1’ and amend Conditions 3 to permit the lapse date to be 10 years from the activation of the consent nominated as 9 December 2018 (to match the lapse date of the prior approval under D/2013/1367).
Alterations and Additions to the Pavilion Restaurant and Kiosk in The Domain (Phillip Precinct) for the refurbishment and extension of existing restaurant (350 patrons).
Holistic approval for the continued use of the Royal Botanic Gardens and The Domain as an entertainment venue for temporary events, and erection of structures associated with these events, for a 10 year period.
Use of numerous locations for the installation of 10 temporary outdoor signage structures in association with the 'Biennale of Sydney' which will run from 16 March - 12 June 2018. Bump in for the structures will occur from 6.00am -10.00am on 16 March 2018 and bump out will occurr from 6.00am - 10.00am on 12 June 2018.
Section 96(2) modification of development consent for installation of temporary structures associated with Opera Australia to permit temporary closure (24 hours) between Fleet Steps and Yurong Gate for construction works between February, March, April and May of 2018, 2019 and 2020.
Installation of fibre optic cable using existing pits in The Domain into the Pavillion Cafe.
Installation of telecommunications infrastructure including underground housing, underground conduit or cable, underground lead in cable, above ground housing.
Four lot subdivision of the Domain Car Park site and surrounds for lease purposes
Fit out & use of part of the Domain car park forecourt as a Thrifty car rental premises.
S96(1A) - Amend condion 4 of consent to allow work to be carried out that will impact on the travelator mural.
S96(1A) - Remove condition 4(a), Schedule 3 to allow pathway from Sir John Young Crescent to have an asphalt finish
Section 96(2) modification for the refurbishment of the Domain car park for the removal of approved internal ramps at L1 and L2 and relocation of car spaces. New lighting is also proposed along approved pathways, installation of signage, gates to College St underpass and upgrade facade painting.
Installation of an underground telecommunications cable at The Domain between the Art Gallery of NSW and St Mary's Road.
Section 96(2) application for the Deferred Commencement Consent for the Domain bus layover to modify the design of the facade and to remove the requirement for a palisade fence.
Integrated development application to upgrade the access road to the Art Gallery of NSW and provide a truck turning bay.
S96(1) to correct typographical error in condition 28.
Section 96(2) to extend contruction hours until 11.00pm Mondays to Fridays and until 7.00pm Saturdays and two new fire doors on the St Mary's Road elevation.
Section 96 (1A) to modify condition 28 in relation to the BCA.
Use of Domain Car Park forecourt as a layover for 20 buses. Works to the building include new driver amenities; demolition of external vehicular ramps; new facade; and fire upgrade, including fire escape doors at St Mary's Rd elevation. External works include lighting; signage; landscaping; changes to vehicular access; and new entry gates to College St pedestrian tunnel.
Installation of temporary facilities for various events to be held between December 2008 and February 2009
Application for consent to host the Melbourne Cup Event between 12.00 midday and 7.00pm on 4 November 2008. Activities include live screening of the event, live music, TAB betting, provision of food and alcohol and beauty services.
Refurbishment of the Domain Car Park. Internal works include the installation of 2 lifts; new ramps and associated car park reconfiguration; and new toilet facilities. External works include replacement of existing pedestrian entrance building, construction of new pedestrian entrance at northern corner and new balustrade at roof level; refurbishment of travelator; signage; landscape works and new pathways.
The erection of a new timber deck for 40 patrons and internal alterations to existing restaurant. Hours of operation are 7am - 12am Monday to Sunday.
Installation of underground LPG tank & associated pipework /pumps including extension of the existing barriers plus signage.