Applications ordered newest to oldest.
Alterations and additions to the existing ground floor atrium space
Erection of business identification sign within the Deutsch Bank Plaza.
Internal alterations to Level 2 of Deutsche Bank Tower to convert an unutilised area into an office.
Installation and operation of architectural lighting to existing roof feature. Consent is also sought for dynamic colour and movement lighting during special events throughout the year.
Demolition of existing access walkway to architectural roof feature.
Proposed internal alterations and additions, infill for removal of intertenancy and void connecting levels 10 and 11.
Installation of a louvre to the level 28 terrace.
Section 96(1A) modification of consent to amend Condition 2 to delete heritage floor space allocation.
Removal of interconnecting stairs between levels 4-5 and 23-24
Section 96 (1A) modification of consent to amend the approved development to reflect revised plans, and changes to end of journey facilities.
Construction of end of Journey facilities (lockers, showers, toilets, bike racks, accessible bathroom) in basement 2 with access via Philip Street.
Continued use of existing ‘Deutsche Bank’ building identification signs. The signage includes ‘Deutsche Bank’ lettering on the eastern elevation, and 3 logos on the eastern, western and southern elevations of the building.
Alterations to 'Deutsche Bank Place' including level 29 infill of stairwell void.
S96 2 Amend Condition 3 of consent to allow continuation of trading hours between 7.00am and midnight on a permanent basis for the existing ground level Dolce licensed restaurant (previously, the trading hours between 10.00pm and midnight, have been on a trial-period basis).
Section 96 (2) application to extend the operating hours of the "Dolce Ristorante" within the ground level of the Deutsche Bank building.
Correct the approved development description for 'Dolce' restaurant to show reference to 94 seats instead of 64 seats.
Minor alterations to internal partition walls within level 32 of Deutschebank Place.
Continued use of the existing ''Deutsche Bank'' signage and logos on the top parts of the building.
Deletion of internal stairs between levels 19 to 21 and infill the void area with concrete slab.
Sec 96 (2) a Removal of acrylic face to approved sign eastern facade & 1 coprorate logo sign
Internal fit-out and use of Tenancy No. 7 at Ground Floor of the Pavillion building as a beautician's shop.
Internal Fitout of ground level Shop 6 for use as a - Newsagent, including tenancy signage.
Stratum land subdivision of two properties into two lots
Use of shop 5 as a retail clothes tailoring and accessories shop & associated fitout and signage
Alterations to ground level retail suites 5,6,& 7 at the above property, including plasterboard inter tenancy division walls, alterations to part of the shopfront to suite 7 and installation of under awning signs for suites 5 and 6.
Subdivision ot the two sites into two lots
Strata subdivision of the building into 96 lots and common property
Internal office fitout of part level 33 and continue to use as offices.
Fitout and use part of Level 32 as an office including a reception area, boarding and meeting room, a break-out area and store rooms.
s96(1A) Delete condition 2 due to docs discrepency conditions can not be fulfilled
Section 96(1a) Minor increase in floor area for internal fitout of Level 30
Fitout and use of Tenancy No. 1 as a "Dolce" restaurant, comprising a 64 seats seating area and operating between 8:30am and 5:00pm Monday to Friday, inclusive.
Section 96 application relative to the fitout of a commercial tenancy to allow extended construction Monday to Saturday 24 hours a day inclusive and 7.00am to 5.00pm on Sundays. Current approved hours are 7.00am to 7.00pm Mondays to Fridays inclusive and 7.00am to 5.00pm on Saturdays with no work on Sundays or public holidays.
Internal fitout o tenancies T2, T3 &T 4 at the above address and use as coffee / sandwhich bar (Dolce)
Commercial office fitout to levels 4, 5, 23-30
Internal office fit-out at level 6 and 7, comprising offices, computer rooms, meeting rooms and utility areas at the above property.
Installation of an External Receiving Device (Satellite dish) on the roof of the commercial tower at the above property.
internal office fitout at Level 31, comprising offices, computer rooms, meeting room, utility areas, and one kitchenette at the above property.
Whole floor internal office fitout at level 34, comprising offices, reception, library, conference room and a tea-bay.
Install 3 ground level building identification signs facing Phillip anbd Hunter Streets, displaying the words "DEUTSCHE BANK PLACE 126".
S96(2) application to modify the hours of work and noise from 7.00am to 7.00pm on Mondays to Fridays, and 7.00am to 5.00pm on Saturdays (no work Sundays) to allow works to be carried out from 7.00am to 11.00pm on Mondays to Fridays, 7.00am to 11.00pm on Saturdays and 7.00am and 5.00pm on Sundays for a period of 12 months
Level 4 internal fitout for use as childcare centre
Installation of lighting to architectural roof feature
Internal office fitout of level 22 of the commercial building.