Local heritage works exemption to remove and replace copper roof sheeting with matching material at Area 1 including minor substrate repairs, new flashings and copings to match existing.
Alterations to bank premises including facade upgrade and new signage
The works are the make good of a 250sqm tenancy which will involve removal of lightweight, non-load bearing internal walls to 2 x meeting rooms and print area, removal and replacement of carpet, new paint to inside of Inter-tenancy walls and adjustment of services (sprinklers, air-con, lighting) back to an open plan layout
Dynamic content business identification signage
Alterations and additions to the Commonwealth Bank of Australia.
PAN-192006
Alterations/additions to commercial tenancy located on Level 10 of the building
Installation of telecommunications infrastructure including underground housing, underground conduit or cable, underground lead in cable, above ground housing.
Replacement of two cooling towers on the roof of a building occupied by the Commonwealth Bank.
Internal alterations to existing bank including new ATM area and changes to the teller area.
Minor internal alterations to Level 10 of a commercial office building including the installation of new partitions.
Repair and maintenance works to the George Street, York Street and Market Street elevations of the existing Heritage building including works to the stone facade and fixings.
Fitout and use Suite 701 on Level 7 as a commercial office
Use Suite 4.01 on Level 4 as a skin cancer and general medical clinic
Replacement of four ATMs at the CBA branch.
Construct two meeting rooms and separation between reception and workstation area on Level 6.
Fitout of office suite 901 including new internal partitions and painting.
Refurbishment of the existing suite No 901A on level 9 and continue to use as a watch repair centre and administration offices.
Internal fitout to tenancy no. 2 on the lower ground floor and use as a clothing shop and to erect an under awning and a top hamper signage.
S96 (2) application to amend condition 24 of the consent to allow construction works to take place 24 hrs a day Monday to Friday.
Section 96 (1A) Internal alterations of the proposed stairs between ground and first floors. Internal modification of fire stair no 3. New plant equipment located on the roof used for additional air conditioning requirements.
Section 96 (2) application to modify consent to allow extended construction hours for internal and external alterations for the Commonwealth Bank Building. Proposed hours of construction are 7.00pm to 10.00pm Monday to Friday.
Renovation of the existing Commonwealth Bank, including reconfiguration of the ground floor and first floor; installation of a new ATM and new signage.
S96(1A) Approved work to be divided into stage 1 & stage 2. Infill void between ground & first floors adjacent to market st facade.
Extension of expiring consent
Internal and external alterations to the lower ground (basement), ground and first floors of the heritage listed Commonwealth Bank Building, approval for signage and signage strategy for the building.
Change of use of suite 1003 (level 10) from an office to a training/education facility
S96(2) (i) Amend condition 1 to make reference to new drawings.