Applications ordered newest to oldest.
Remove existing defective 1969 Marseille roof tiles and battens. Install new copper batten roll roof covering on the main roof of History House.
Strengthen and tie down the existing roof framing on History House. All works are internal and primarily within the existing roof space.
Section 4.55(1) modification of consent to amend Condition 3(a) in Schedule 1A
Input from structural and services
PAN-91057 S4.55 (2) Modification of consent
Installation of telecommunications infrastructure including underground housing, underground conduit or cable, underground lead in cable, above ground housing.
Alterations and additions to the existing building known as 'History House' including a new two-storey rear addition, a roof top addition, conservation works and internal alterations.
Conservation, repair works, and refurbishment of History House, including stonework, new windows, reconfiguration of bathrooms and new air conditioning system.
Continue to use food premises as modified, including office partitioning.