Applications ordered newest to oldest.
Alterations to include new external lighting to an approved mural. The external lighting will only operate during non-daylight hours and will not operate between 11.00pm - 6.00am.
Section 4.55(1A) modification of consent to further stage the approved development.
S4.55(1) - Modification to amend condition 8 to correct the Section 7.12 contribution levy rate
S4.55(1A) - Modification of consent to stage the approved development as stage 1 - facade louvres, and stage 2 - Additions and alterations to commercial office premises including new signage zone,
public art zone, and terraces at Level 3 and Level 14
New application for outdoor dining on footpath
Alterations and additions to commercial office premises including new signage zone, public art zone, air hanlding system, and terraces at Level 3 and Level 14.
Use public footway on (Holt Street) for outdoor seating in association with 'Brooklyn Depot' (4 tables, 11 seats). Proposed hours of use are 10.00am - 10.00pm, Monday to Sunday inclusive.
S96(2) modification to the approved licensed restaurant. The modifications include internal re-configuration, changes to external signage, an increase in the maximum number of patrons and staff from 83 to 134 and modification to the hours of operation to 10.00am to 12 midnight Monday to Saturday and 10.00am to 10.00pm Sunday. The approved hours of operation are from 10.00am to 10.00pm Monday to Sunday.
Alterations to the existing building including modifications to the street level glazing, a new awning, and internal refurbishment of lobby.
Fit-out and use of the ground floor tenancy fronting Holt Street for a restaurant.
Section 96 (1). Delete condition 1a(2) "design modification"
The enclosing of the existing Holt Street colonnade of No 65 Holt Street (418a Elizabeth Street), excluding the existing Basement Garage driveway.
Use of the public way as an outdoor seating area in conjunction with the café at Shop 1, 418A Elizabeth Street, Surry Hills (trading as 'Not the Old Fish Shop').
Alterations and additions to Elizabeth Towers including the refurbishment of the foyer area and resurfacing the main entry footpath.
Fitout of existing office on level 2 with new partitions and furniture.