Applications ordered newest to oldest.
Alterations to office premises on level 16 and alterations to use premises on level 15 as a function centre. Alterations include installation of louvres, removal of stairs, and infill of void.
S4.55 to provide for additional " Crescent Wealth " sign on north elevation of existing roof structure.
S4.55(2) modification of consent to continue the outdoor trial trading hours of licensed ‘Contrabando’ restaurant from 6.30am - 12.00 midnight Monday to Sunday inclusive. The outdoor base hours are amended to 7.00am – 10.00pm Monday to Sunday inclusive. The indoor base hours of operation are amended to 6.30am – 12.00 midnight Monday to Sunday inclusive. The base hours are modified to be consistent with the base hours of operation in the Late Night Management area under the Sydney Development Control Plan 2012 and maintains the current hours of operation.
Two illuminated top of building 'Crescent Wealth' business signs to be installed on the north and west elevations of existing roof structure.
Extension of indoor and outdoor operating hours of approved licensed restaurant and associated outdoor dining area known as Contrabando. The proposed hours of trading hours are between 6.30am and 12.00 midnight, 7 days per week. The restaurant has an indoor patron capacity of 126 person and outdoor patron capacity of 24 persons.
Erection of signage adjacent to the main entrance of Hudson House fronting Macquarie Street.
Use of 13.6sqm of the public footway on Macquarie Street for outdoor seating in association with the licensed 'Contrabando Restaurant'.
Section 4.55(2) modification of consent to continue the display of illuminated top of building signage on the eastern facade.
Section 96 (2) modification of consent to grant a 5 year extension for building identification signage 'Hudson House' on the building facade facing Macquarie Street.
Change of use to Level 14 as commercial offices.
Refurbishment of existing building including demolition of some internal walls and part of eastern elevation. Change of use of Levels 1 to 7 and Levels 9 to 13 from commercial offices to 12 x 4 bedroom residential apartments.
Installation of balustrade around ledge/balcony at the rear of level 6, for use in conjunction with the existing approved supplementary air condition unit.
Internal office fitout to Levels 15 and 16 of Hudson House including relocation of interconnecting staircase, installation of new kitchen and bar areas and office/training/meeting rooms.
Strata subdivision of Lots 1, 18 & common property into six lots and common property
Removal of existing planter boxes from the existing terrace and the installation of new stainless steel and glass handrails to replace existing handrails at Hudson House on Macquarie Street.