Applications ordered newest to oldest.
PAN-155478
Internal alterations and additions to existing office space on level 10.
PAN-154610 - Alterations to office premises located on Levels 8 and 9
PAN-94020 Alterations to commercial development.
Office fitout to part of level 6
Alterations to shop including installation of 3 shopfront windows, erection of 3 signs to the shopfront, replacement of 2 internally illuminated shallow display cases, repainting of awning in same colour as existing, and repair and repaint existing facade walls and columns along Harrington Street.
S96(2) - Modification of the internal fitout works at ground and first floor tennacy by Dior.
Change of use of part of level 5 from retail use to commercial office space with associated alterations and fitout. External alterations are proposed including changes to building frontage and 2 signs. Internal works include replacing entry stairs, new foyer area, alterations to bathrooms, storage areas and general fitout. Fitout and use of cafe on Level 5.
Internal alterations to ground floor tenancy consisting of retail fitout and signage.
External alterations to the commercial tenancy known as 'Louis Vuitton' including general shopfront maintenance and replacement of existing signage.
Interior fitout to Levels 6 and 7 of the building.
Internal fit out works within Level 7, including the provision of 6 new workstations & 2 new meeting rooms with air conditioners.
Installation of temporary art and performances as part of the Museum of Contemporary Art's Primavera Exhibition 8 September to 13 November 2011
Internal fitout to part level 3 and use as staff lounge area
Internal fitout of level 2 and continue to use as offices.
Internal fitout of part level 9 and continue to use as offices.
To install new doors to the existing offices on level 10
Mobile phone base station comprising antennas and equipment shelter on rooftop.
Minor layout alterations to the existing office on levels 8 and 9 including demolition of existing partitions and construction of new glass and plasterboard partitions.
Internal fitout works within Level 7, including provision of new boardroom to the existing office area.
Section 96 (1A) application to allow the removal of existing internal partitions and the construction of new partitions upon level 3 of the DFS Galleria building.
Construction of internal partition walls upon levels 3 and 4 of the DFS Galleria building to create additional back of house and office areas.