Applications ordered newest to oldest.
Stratum title subdivision
Upgrades to security measures to minimise the potential for unauthorised entry into the building. Works proposed include the installation of swipe-card activated raceways to the upper landings of the stairs within the Grand Hall, to control and monitor access to the upper office levels.
Alterations and additions to the Grand Hall to upgrade new security measures. The application is integrated development requiring the approval of the NSW Heritage Council under the Heritage Act 1977.
Install three wi-fi access points withn modern ceilings
Proposed upgrade works to the Level 10 rooftop terrace. Three main items:
- Replacement of sections of the existing glass balustrading and installation of new sections of glass balustrading to improve safety
- Installation of a new chicken coop on the roof terrace, to replace the chicken coop formerly installed on the rooftop of the adjoining building before its demolition.
- Installation of Davit arms rigging system to assist in the ongoing cleaning and maintenance of the building and its highly significant external facades.
Subdivision of land in 3 lots.
Alterations and additions to commercial development at the Level 10 rooftop including balustrade upgrade works, new chicken coop and new Davit Arm facade cleaning system. The application is Integrated Development requiring the approval of Heritage Council of NSW under the Heritage Act 1977.
PAN-191555 - Alterations to commercial development including rectification works on the southern facade. The application is Integrated Development requiring the approval of Heritage Council of NSW under the Heritage Act 1977.
PAN-189214 Use of Levels 2-4 of the North Site as a licensed function centre. The proposed hours of operation are 6am to 12am Mondays to Sundays inclusive.
s60 - installation of temporary protection structures
S60 - Installation of the 'Warrane' Exhibition.
Fit out and use of part of the ground floor as exhibition space comprising physical artefacts and digital media for a period of 5 years. Works include installation of electronic displays, projection screens, custom made joinery and visitor seating. The applicatioin in Integrated Development requiring the approval of the Heritage Council under Section 58 of the Heritage Act 1977.
Alterations to commercial offices within the ‘Commonwealth Bank’ building including the installation of secondary glazing to the interior of windows and doors on Levels 1 – 9, on the southern facade.
S96 1(a) - reword condition 9A, Amend the upper basement level to provide bicycle parking.
Installation of telecommunications infrastructure including underground housing, underground conduit or cable, underground lead in cable, above ground housing.
S96(2) application for the installation of 2 additional flagpoles to the level 2 balconies (one per balcony) projecting over Martin Place.
Automation of bronze-framed glazed doors leading off Castlereagh Street.
Installation of three flagpoles and flags to the level 2 balconies (one per balcony) projecting over Martin Place.
Installation of ten flagpoles to the five second floor balconies projecting over Martin Place. The proposed flagpoles are 100mm in diameter, seven metres long. Six Australian and four New South Wales flags are proposed.
Installation of public artwork within the northern end of the Banking Chamber of Commonwealth Bank, entitled 'Black Mirror', by Australian artist Daniel Boyd
Section 96(1A) modification of consent for one additional business identification signage to the Martin Place elevation.
Section 96(1a) modification of consent for addition of disabled access hoist and associated blade wall.
Integrated development for external Macquarie Bank Limited business identification signage located on the heritage facade of frontages at Martin Place, Castlereagh Street and Elizabeth Street. Proposal includes removal of the 'Commonwealth Bank Australia' bronze lettering on Martin Place facade.
Section 96(1A) modification of consent. Proposed changes are to the ground floor reception area, changes to circulation and access on the upper floors, providing an alternative construction solution for the light well glass roof, retention of doors to Elizabeth Street and changes to condition requiring bicycle parking and end of trip facilities in the adjacent building.
Alterations and additions to the Castlereagh Street lobby of the 'Commonwealth Bank' building including replacement of two ATMs, formation of a new doorway, removal of an existing door and associated signage.
Installation and display of temporary signage to the Castlereagh Street construction hoarding.
Section 96(1A) modification of existing consent to modify Condition 2 relating to the amount of transferable Heritage Floor Space.
Section 96(2) modification of consent to extend the approved construction hours to allow internal demolition, construction and fit out works to occur 24 hours a day, 7 days a week.
Internal office fitout to levels 1-11 of the Commonwealth Bank building.
Section 96(2) modification of consent for internal restoration and renovation works and a rooftop addition to the Commonwealth Bank building. Modifications include changes to car and bicycle parking areas, plant areas, stairs, ramps, staff amenities, doors and the configuration of spaces within the building.
Section 96(1) modification of consent to alter the wording of Condition 8A(b) relating to the retention of the northern perimeter beam of the atrium.
Section 96(2) modification of consent for internal restoration and renovation works and a rooftop addition to the Commonwealth Bank building. Proposed changes are the provision of two new glass shuttle lifts between the Banking Chamber and Levels 10 and 11.
Section 96(2) modification of consent for internal restoration and renovation works and a rooftop addition to the Commonwealth Bank building. Proposed changes are to the size and design of the rooftop addition, the inclusion of a new mezzanine level, alterations to the internal configuration and an enlarged opening to the atrium below.
Section 96(1A) modification of existing consent to modify Condition 2 relating to the amount of transferable Heritage Floor Space.
Modifications to ATM facilities and minor alterations to existing CBA signage along Castlereagh Street.
s96 1(a) Modify condition 2 by reducing amount of transferable heritage floor space
Integrated Development Application for stage 2 refurbishment works of the existing Commonwealth Bank Building including internal restoration and renovation work and a rooftop addition.
Section 96(1A) modification to the proposed internal glazed partitions.
Internal alterations to levels 1,3,4,7,8 & 9 of the Commonwealth Bank building including alterations to partitions and the installation of new furniture and equipment.
Integrated Development for the refurbishment of the ground floor banking chamber and lower basement for the Commonwealth Bank.
Integrated Development application for the installation of security upgrade measures to the existing Commonwealth Bank at ground floor level.