Applications ordered newest to oldest.
Amalgamation of units 411 and 412, including minor internal alteration
Substructure repairs to the Finger Wharf, replace end of life fabric, reinstating missing or loose elements, and removal of redundant services.
Amalgamation of two existing apartments into one
Installation of external blind to existing balcony of unit 210, fixed to underside of balcony ceiling in line with balustrade
PAN-210684 – Section 4.55(1A) modification of consent for amalgamation of Units 217 & 218. Proposed changes relate to internal design alterations and removal of strata lot consolidation condition.
PAN-159534 – Amalgamation of Units 217 & 218 into one unit, including associated internal alterations.
Heritage works for proposed remedial works to external timber wall cladding and window joinery to Wharfs 6, 7, 8 and 9, and refurbishment of the gantry beam to the south-east carpark entry between Wharfs 6 and 7.
Alterations and additions to units 210 & 211, including new opening to balcony dividing wall in order to amalgamate both units into one.
Installation of folding awnings to Level 1 of the eastern facade of the residential portion of Wharf 7 of the Wharves at Woolloomooloo. The application is Integrated Development requiring the approval of the (NSW Heritage Council) under the (Heritage Act 1977)
Alterations to level 1 at Wharf 8 and the northern portion of Wharf 9 of the Wharves at Woolloomooloo including new folding arm awnings.
Internal alterations to Unit 216 including wall removal/reconfiguration, new flooring throughout the unit and refurbishment of the kitchen, bathroom and laundry.
The provision of wireless internet services to Woolloomooloo Wharf, involving installation of panel antenna on every third lamppost on both sides of the wharf.