|
Shadow drawings based on survey information prepared by Woods Bagot March 2024
|
24 Apr 2024 |
|
NatHERS Stamped Plans (220128)
|
13 Apr 2024 |
|
NatHERS Certificate - Darlinghurst (220128)
|
08 Apr 2024 |
|
BASIX Certificate - Darlinghurst (220128)
|
08 Apr 2024 |
|
Notification letter - D/2022/831
|
08 Apr 2024 |
|
Waste Management Plan prepared by MRA Consulting dated 17 March 2023.
|
08 Apr 2024 |
|
Waste Management letter prepared by MRA Consulting dated 28 March 2023.
|
08 Apr 2024 |
|
BCA Assessment Report prepared by Credwell Consulting Pty Ltd dated 1 December 2023.
|
08 Apr 2024 |
|
Traffic letter prepared by Stantec dated 6 December 2023.
|
08 Apr 2024 |
|
Site Survey Plan prepared by C-Side Surveyors dated 14 March 2023.
|
08 Apr 2024 |
|
Public Art Plan (Preliminary) prepared by UAP dated March 2023.
|
08 Apr 2024 |
|
DA-8806_SURROUNDING VIEW POINTS[1]
|
08 Apr 2024 |
|
DA-8815_ROOFTOP DETAILS[1]
|
08 Apr 2024 |
|
DA-8816_ROOFTOP DETAILS[1]
|
08 Apr 2024 |
|
DA-8817_COURTYARD SECTIONS[1]
|
08 Apr 2024 |
|
DA-8818_EXTENT OF MATERIAL DETAIL[1]
|
08 Apr 2024 |
|
Preliminary site (Contamination) Investigation prepared by Douglas Partners dated 7 September 2023.
|
08 Apr 2024 |
|
Clarification of Contention 5d prepared by Woods Bagot dated 16 February 2024
|
08 Apr 2024 |
|
Structural engineer report prepared by Mance Arraj dated 13 February 2024
|
08 Apr 2024 |
|
Waste response to SOFAC by MRA Consulting
|
08 Apr 2024 |
|
Historical archaeological impact assessment prepared by Urbis 1 March 2024
|
08 Apr 2024 |
|
Historical archaeological research design and excavation methodology - Urbis
|
08 Apr 2024 |
|
Supporting Heritage Letter prepared by Urbis
|
08 Apr 2024 |
|
Visual Impact Images prepared by Urbaine
|
08 Apr 2024 |
|
Supporting Traffic Letter prepared by Stantec
|
08 Apr 2024 |
|
Supporting Acoustic Letter prepared by PWNA
|
08 Apr 2024 |
|
Construction Noise and Vibration Management Plan prepared by PWNA
|
08 Apr 2024 |
|
Preliminary CTMP Prepared by Stantec
|
08 Apr 2024 |
|
Amended Civil Plans prepared by Intrax
|
08 Apr 2024 |
|
Fire Engineering Letter prepared by Fire Safety Studio dated 23 November 2023.
|
08 Apr 2024 |
|
Site Specific Flood Assessment Report prepared by GRC Hydro dated 30 November 2023.
|
08 Apr 2024 |
|
BCA Report letter prepared by Credwell Consutling Pty Ltd dated 1 December 2023
|
08 Apr 2024 |
|
Fire Engineering Letter prepared by Fire Safety Studio dated 16 March 2023.
|
08 Apr 2024 |
|
DA-3304_WEST FACING PROPOSED ELEVATION[4]
|
08 Apr 2024 |
|
DA-3305_LONG SECTION[4]
|
08 Apr 2024 |
|
DA-3306.1_SHORT SECTION[2]
|
08 Apr 2024 |
|
DA-3306_SHORT SECTION[4]
|
08 Apr 2024 |
|
DA-3307_HEIGHT PLANE STUDY[4]
|
08 Apr 2024 |
|
DA-7702.0_JUN SUN EYE VIEW PROPOSED[4]
|
08 Apr 2024 |
|
DA-7702.1_JUN SUN EYE VIEW PROPOSED[4]
|
08 Apr 2024 |
|
DA-7702.2_JUN SUN EYE VIEW PROPOSED[4]
|
08 Apr 2024 |
|
DA-7702.3_JUN SUN EYE VIEW PROPOSED[4]
|
08 Apr 2024 |
|
DA-7702.4_JUN SUN EYE VIEW PROPOSED[4]
|
08 Apr 2024 |
|
DA-7702.5_JUN SUN EYE VIEW PROPOSED[4]
|
08 Apr 2024 |
|
DA-7702.6_JUN SUN EYE VIEW PROPOSED[4]
|
08 Apr 2024 |
|
DA-7703.0_JUN SUN EYE VIEW EXISTING[4]
|
08 Apr 2024 |
|
DA-7703.1_JUN SUN EYE VIEW EXISTING[4]
|
08 Apr 2024 |
|
DA-7703.2_JUN SUN EYE VIEW EXISTING[4]
|
08 Apr 2024 |
|
DA-7703.3_JUN SUN EYE VIEW EXISTING[4]
|
08 Apr 2024 |
|
DA-7703.4_JUN SUN EYE VIEW EXISTING[4]
|
08 Apr 2024 |
|
DA-7703.5_JUN SUN EYE VIEW EXISTING[4]
|
08 Apr 2024 |
|
DA-7703.6_JUN SUN EYE VIEW EXISTING[4]
|
08 Apr 2024 |
|
DA-7710.0_JUN SHADOWS PROPOSED[4]
|
08 Apr 2024 |
|
DA-7710.1_JUN SHADOWS PROPOSED[4]
|
08 Apr 2024 |
|
DA-7711.0_JUN SHADOWS PROPOSED[4]
|
08 Apr 2024 |
|
DA-7711.1_JUN SHADOWS PROPOSED[4]
|
08 Apr 2024 |
|
DA-8800_COMPUTER GENERATED IMAGE[4]
|
08 Apr 2024 |
|
DA-8801_MATERIALITY[4]
|
08 Apr 2024 |
|
DA-8802_COMPUTER GENERATED IMAGE[4]
|
08 Apr 2024 |
|
DA-8803_HIGH LEVEL WINDOW DETAIL ELEVATION[4]
|
08 Apr 2024 |
|
DA-8804_ADJACENCY DIAGRAM[4]
|
08 Apr 2024 |
|
DA-8805_FIRE HYDRANT & SPRINKLER BOOSTER DETAIL[3]
|
08 Apr 2024 |
|
DA-2206_LEVEL 02[4]
|
08 Apr 2024 |
|
DA-2207_TYPICAL UPPER - LEVEL 03-06[4]
|
08 Apr 2024 |
|
DA-2209.0_ROOF LEVEL[4]
|
08 Apr 2024 |
|
DA-2209.1_ROOF[4]
|
08 Apr 2024 |
|
DA-2210_AREA[4]
|
08 Apr 2024 |
|
DA-2211_STORAGE[4]
|
08 Apr 2024 |
|
DA-2212.1_SOLAR ACCESS STUDY[2]
|
08 Apr 2024 |
|
DA-2212_SOLAR ACCESS & CROSS VENT[4]
|
08 Apr 2024 |
|
DA-2213_DEEP SOIL[4]
|
08 Apr 2024 |
|
DA-2214_TOTAL FLOOR AREA[3]
|
08 Apr 2024 |
|
DA-2601_1 BED ADAPTABLES LEVEL GROUND[4]
|
08 Apr 2024 |
|
DA-3300_LIVERPOOL STREET EXISTING ELEVATION[4]
|
08 Apr 2024 |
|
DA-3301_LIVERPOOL ST PROPOSED ELEVATION[4]
|
08 Apr 2024 |
|
DA-3302_DARLEY PLACE PROPOSED ELEVATION[4]
|
08 Apr 2024 |
|
DA-3303_EAST FACING PROPOSED ELEVATION[4]
|
08 Apr 2024 |
|
Amended Landscape Maintenance Schedule RevC prepared by Dangar Barin Smith dated April 2024
|
08 Apr 2024 |
|
Architectural plans prepared by Woods Bagot dated 5 April 2024 (consolidated)
|
08 Apr 2024 |
|
Clause 4.6 variation request (height of buildings) prepared Ethos Urban 5 April 2024
|
08 Apr 2024 |
|
Design statement prepared by Woods Bagot dated 5 April 2024
|
08 Apr 2024 |
|
Geotechnical comments prepared by Douglas Partners dated 5 December 2023
|
08 Apr 2024 |
|
Landscape plans prepared by Dangar Barin Smith (Rev L) dated 5 April 2024
|
08 Apr 2024 |
|
Report on geotechnical investigation prepared by Douglas Partners dated 29 August 2023
|
08 Apr 2024 |
|
Schedule of amendedments to architectural plans prepared by Woods Bagot dated 5 April 2024
|
08 Apr 2024 |
|
View loss assessment prepared by Ethos Urban dated 5 April 2024
|
08 Apr 2024 |
|
DA-1102_EXISTING SITE PLAN[4]
|
08 Apr 2024 |
|
DA-1103_PROPOSED SITE PLAN[4]
|
08 Apr 2024 |
|
DA-1104_SITE PHOTOS[4]
|
08 Apr 2024 |
|
DA-1105_EXISTING BUILDING PLAN[4]
|
08 Apr 2024 |
|
DA-2200_DEMOLITION PLAN[4]
|
08 Apr 2024 |
|
DA-2201_BASEMENT 3[4]
|
08 Apr 2024 |
|
DA-2202_BASEMENT 2[4]
|
08 Apr 2024 |
|
DA-2203_BASEMENT 1[4]
|
08 Apr 2024 |
|
DA-2204_GROUND LEVEL[4]
|
08 Apr 2024 |
|
DA-2205_LEVEL 01[4]
|
08 Apr 2024 |
|
Notice of Determination - D/2022/831
|
09 Nov 2023 |
|
Submissions D/2022/831 24 April 2024 9:40 am
|
07 Oct 2022 |
|
3D_model_ Liverpool_St_349_DARLINGHURST_D2022_831_submitted_16SEP22 - SUPERSEDED
|
19 Sep 2022 |
|
Architectural Design Report _PAN-252229 - SUPERSEDED
|
14 Sep 2022 |
|
QS Report_PAN-252229
|
19 Aug 2022 |
|
Arboricultural Impact Statement_PAN-252229
|
19 Aug 2022 |
|
Acoustic Assessment_PAN-252229
|
19 Aug 2022 |