Applications ordered newest to oldest.
Site preparation, remediation, excavation and construction of a mixed use development comprising residential, commercial and retail uses across three (3) buildings, basement parking, landscaping, public domain works
including the construction of new roads and a two stage Torrens title subdivision into three (3) stratum lots. The second stage of subdivision will dedicate two of the stratum lots as public road. The proposal is Integrated Development under the Water Management Act 2000, requiring the approval of WaterNSW.
Section 4.55(1A) modification of consent to continue use of the site for a temporary through-site link and public activation for a further 18 months.
PAN-183024
S4.55(2) - Modification of consent to continue use of site for a temporary through-site link and public activation.
PAN-53328 - Construction and use of Sites 7, 17 and 18 within Green Square Town Centre for a temporary though-site link and public activation. Works involve minor stormwater and public domain works, installation of temporary moveable seating, planters, hoardings and pop up activation.
PAN-38388 S4.55 (1A) The application seeks the replacement of several approved drawings to revised versions which incorporate a change in hoarding material from chainlink wire fence to timber hoarding along the Botany Road, Geddes Avenue and Paul Street frontages. Accordingly, this will also result in a change to the graphic material from shadecloth to printed vinyl. In addition, the height of the hoarding graphics will increase from 2.8m to 3.0m to match the slightly taller height of the Type A hoarding structure to be installed.
Application of temporary signage graphics to construction fencing and hoardings at sites 7, 8, 15, 17, 18 and 19 Green Square Town Centre. The signs will include:
- Max 10sqm or 10% (whichever is the larger) per frontage – business identification signs
- Max 30% per frontage - architectural exterior and interior project photomontages.
- Min 10% across the site – community infrastructure info, local wayfinding, local curated artworks (subject to CoS agreement and input)
- Balance as lifestyle images, general graphics, colours, themes
Signage fixed to construction hoardings associated with Sites 15 and 18 within the Green Square Town Centre.
Mixed use development on Site 7 and 17 within Green Square Town Centre comprising one 16 storey and one 13 storey building (plus roof plant) with retail, commercial, entertainment (cinema) and residential uses, and use of an integrated basement for car parking spaces (construction of the basement is subject of a separate development application).
Construction of a 20-storey mixed use residential building comprising 103 residential apartments over levels 2-20, retail uses on Level 1 (ground) and Level 2, and communal facilities on the rooftop and Level 2. Three storey basement, the partial fit-out of the basement, site remediation, and landscaping.
Four temporary signs for the approved hoardings on Barker Street, Ebsworth Street and Tweed Place.
Erect Type A hoarding on private land fronting the vacant sites adjacent Ebsworth Street, Tweed Place and Barker Street, Zetland.
R/2013/30 - Ddication of land for new public domain, roads and plazas, works in-kind for essential infrastructure and public domain, design and construction of buildings to be capable of using recycled water, requirements for space heating and cooling and monetary contributions towards community infrastructure.