Applications ordered newest to oldest.
PAN-142900 - Signage to the Martin Place elevation of the existing Omega retail tenancy 2, including 4 illuminated business identification fascia, bulkhead and wall plate signs.
PAN-92319 Signage to the ground and first floor Martin Place elevation of Tenancy 1
Erection and display of five (5) signs to the Martin Place elevation of the subject building, with additional window display elements.
Section 96(2) modification of consent to update the approved signage strategy.
Change of use of a lower ground shop fronting Hosking Place to a licensed restaurant (250 patrons) and associated alterations
Installation of 2 signs to the Martin Place elevation of the existing commercial building.
Signage strategy for future business identification signage (associated with the retail tenants at ground floor) for the commercial building known as 20 Martin Place.
Change of use of ground floor "Tenancy 1" to a vehicle sales premises for "Tesla" and associated alterations.
Section 96(2) modification of consent to divide the existing single retail tenancy located on the upper ground and first floor into two seperate tenancies, including associated works.
New awning at entry door on Pitt Street and three new ANZ signs.
s96 1(a) Modification to condition 22 to clarify driveway setback requirements. Modification to condition 53 to change the timing of the delivery of the landscaping to the final OC.
Section 96(1A) modification of consent to amend the approved plans of Condition 1 relating to the retail banking space proposed to be occupied by ANZ.
Section 96(1) modification of the approved development seeking to correct the plan references included in Condition No. 1 of the Development Consent.
S96(1A) modification of consent for signage on construction hoarding fronting Pitt Street and Martin Place. Proposed change is to extend the time period permitted for the construction hoarding signage
Section 96 (1A) modification of the approved development relating to the timing of Condition No. 6A (Restriction on end of journey facilities).
Section 96 (1A) 1. Changes to the approved plans and finished board. 2. Modification to the Condition 5 Design Details to reflect changes to the approved plans.
Section 96(2) Amend condition number 3 to required tenancy strategy to be submitted and approved prior to issue of stage 3 Construction Certificate.
S96(1): Condition 7(A) - Amend max. building height (to top of plant) from RL 102.09 AHD to RL 102.81 AHD to reflect stamped plans.
S96(1A): Condition 2 - Delete condition and instead reference cast glass details specified in attached letter.
Signage on construction hoarding fronting Pitt Street and Martin Place.
S96(1) Change condition 48 from Stage CC to Stage 2 CC requirement.
S96 (1A) Modification to condition 64 & inclusion of demolition plans into conditions of consent.
S96 (1A) Administrative modifications to enable staging of CC's.
Section 96(1A) modification of consent to reallocate floorspace under the new GFA definition in the Sydney LEP 2012 and associated changes to plans and conditions.
Refurbishment of existing commercial building including structural works to facilitate modified/refurbished floors, relocation of the building core, replacement of the building facade, provision of retail spaces fronting Martin Place, Pitt Street and Hosking Place, roof top landscaping, new signage zones, extension of the existing basement. The site also has frontage to Pitt Street and Hosking Place.
Installation of a standby generator and acoustic enclosure to the plant room roof on Level 5.5.
Erect new high level building name signs to update existing in line with new corporate branding. (ANZ Bank).
New ANZ signage on the Martin Place and Pitt Street facades.
Installation of mobile phone telecommunications infrastructure on the ANZ Bank building
To install two new louvreson the north elevation (levels 12 and 13) of the ANZ Bank Building.
Fitout of Level 12 for ANZ office.
Alterations to the external courtyard and adjacent commercial office area at Level 5 of the building at the above property, including installation of a glazed balustrade.
S96(1a) Inclusion jof raceways at groundfloor,basement & lower ground floors
Sect 96 (1) Condition schedule 1a subclause (2a) the be change from railing constructed from bronze to stainless steel
Installation of three external bronze handrails on ANZ property.
Internal alterations to provide a cafe area and two meeting rooms within ground floor lobby at the above address for the exclusive use of ANZ building occupants.
To install a new louvre on Level 15 of the ANZ Bank Building.