Applications ordered newest to oldest.
The subdivision of the site, being Lot 2 DP 1015633, into 2 lots.
Plan of Subdivision of Lot 2 in DP 1015633
Stage 2 DA for the construction of a mixed use development comprising construction of a part 8 and part 20 storey mixed use building above 3 basement car parking levels. Proposed uses of the building include 401 apartments; retail tenancies along Botany Road, Bourke Street, future Tweed Place, future Ebsworth Street and future Green Square Plaza; a multi-purpose function facility and car parking for 403 vehicles. The proposal also includes a through-site link from Ebsworth Street to the Green Square Plaza and site landscaping.
Section 96(1a) to change tree species related to condition 38
Construction of the Green Square Town Centre Library and Plaza. The works comprise earthworks, remediation and construction and use of a predominantly underground single storey library incorporating an entry triangle with licenced cafe, sunken garden, sunken amphitheatre and a narrow seven storey library tower element. Works also include public domain improvements through the establishment of the public plaza, a shared access zone, signage and public art.
Section 96(1a) to modify approved building envelope to reflect winning design competition entry Modify conditions 4,5,6,7,10,15,16,17,19,20.
Modify condition 61 to delete requirement for security when council is undertaking works
Section 96(1A) modification to amend approved street tree species listed at Condition No. 38
Section 96(1a) modification to amend Condition No. 38 to permit the removal of trees for the installation of crossovers.
S96(1A) Inclusion of additional reference plans under condition (1) approved development. Removal of condition (8) Future open space-Drying green and condition (9) Drying green storage basin.
Provision of essential infrastructure for the Green Square Town Centre, including demolition of minor structures and tree removal, construction of new roads and associated infrastructure, concept landscaping and streetscape design, provision of above and below ground services (including stormwater, sewer, water, electrical and telecommunications) and staged construction.
Stage 1 concept proposal for site layout and indicative building envelopes for a mixed-use development ranging in height from 8 to 18 storeys.
Section 96(1a) to extend current deferred commencement approval due to expire on 24 Novemebr 2010
S96 (1) Modification to extend the "deferred commencement" date by 12 months. No other changes requested.
Town Centre essential infrastructure including the construction of new roads, footpaths and services such as stormwater, sewer, power and telecommunications.