The Quadrangle ICT Upgrade - Stage 3 South-West Wing, University of Sydney
Upgrade of existing services to the Old Teachers Building, University of Sydney. This includes installation of ducted air conditioning and a fume extraction system on Level 2 requiring new penetrations to Levels 2, 3 and 4, new ductwork and a roof cowl. There are also associated works within the Level 2 moat.
Works to reinstate/reactivate the Rooftop Terrace, Fisher Libary
Rooftop waterproofing of the Chemistry Building, University of Sydney, including roof repairs, membrane replacement and new overflows
Variations to the proposed Upgrade of the IT Cabling in Manning House (A23)
Fit-out to rooms to create Hybrid Connectivity Spaces in Mannng House, Camperdown Campus, University of Sydney
The Quadrangle IT Upgrade – Stage 2 North-West Wing, University of Sydney
Holme Building, Level 4 Works: Disability Access & AV
Works to reinstate /reactivate the Rooftop Terrace, Fisher Library
Installation of new ICT cabling in the Great Hall
Upgrade of the IT cabling in Manning House (A23).
Construction of all gender bathrooms on Level 1, and associated services and mechanical works upgrades to Fisher Library, University of Sydney.
Demolition of three existing buildings (Bosch 1A; Bosch 1B; and the Bosch Greenhouse), the associated perimeter retaining walls and twenty four (24) affected trees.
Demolition of Bosch 1A Building (D04), Bosch 1B Building (D05), and the Bosch Glasshouse (D16) at the University of Sydney
An upgrade of the ICT system within the JD Stewart Building, University of Sydney
Subdivision of land to create two lots, one containing Wesley College and the other being the residue of the site which will effectively be a consolidation of lots comprising the Camperdown Campus of the University of Sydney.
Installation of wi-fi antennae on heritage buildings fronting the Science Road Precinct
Installation of two small glazed awnings over doors on the southern elevation of the John Woolley Building
Minor refurbishment of office space
Repairs to a number of sections of the slate roof and gutters of the Quadrangle
PAN-115625 - Removal and replacement of three (3) Fig Trees
PAN-90303 Subdivision of land into 4 lots
Roof alterations to the existing Arena Sports Centre within Sydney University (on Western Avenue), including the installation of solar panels.
Section 96 1(A) Modification change to the size and shape of the subdivided lot.
Installation of solar panels to roof of five (5) buildings at the University of Sydney.
Installation of a new score board and four lighting towers adjacent to Oval No. 2 within University of Sydney Camperdown campus.
Alterations and additions to the School of Chemistry building at the University of Sydney including internal demolition, fitout of a chemical storage facility, extension of the loading dock and temporary external chemical storage area
Section 96(1A) Modification of boundary for Lot 102.
Section 96(1A) modification of consent for construction of a new three storey grandstand at Oval No.2. Proposed changes seek to remove 3 trees.
Subdivision of Lot 51 DP 1194640 and Lot 1 DP 1171804 into three lots together with easements for access over part of Fisher Road.
Section 96(1A) modification of consent for construction of a three storey granstand on Oval No.2 including vehicle access and parking, landscaping, lighting and tree removal. Proposed changes seek to modify conditions 41 and 42 to allow removal of a tree previously listed for retention.
Subdivision of Lot 1 in DP 1171804 into two lots
Section 96(1a) Modify condition (1)(a) to specify fortnightly compliance to occur only during the construction period. Deletion of Condition 11, 15, 18 .
Demolition of the existing Fisher coffee cart marquee. Construction of a new cafe kiosk building and associated outdoor (covered) seating area. Hour of operation: Monday to Sunday 7am - 9pm including public holidays. Construction of a new ramp and landing to the existing west facing exist from the Stack.
Construction of a new three storey grandstand building on the western side of Oval No.2 comprising approximately 1100 seats, 3 indoor cricket nets, gym, change rooms, office space, commercial kitchen and licenced function centre for up to 300 persons. Modifications are also proposed to the existing Oval No.2, vehicle access and parking, landscaping, lighting, tree removal.
Section 96 1a New flat roof for lift overrun to existing roof of the Holme Building and amend condition 1
Change of use to commercial kitchen and non-licensed cafe at Level 1 Carslaw building Eastern Avenue, Sydney University.
Section 96(1a) proposed new door openings.
Removal (demolition) of the existing weatherboard building, D11 Chaplaincy
Temporary placement of survey pavilion containing examples of student housing accommodation. 5 Display units, serviced toilet and semi-sheltered outdoor area to be placed on the lawn for 3 weeks for exhibition and single overnight stays.
Alterations and additions to the existing Holme building, including the fit out and use of a new cafe/bar/function room, an outdoor cinema within the Pleasaunce courtyard, removal of 6 trees, landscaping and alterations to the buildings Parramatta Road facade.
Construction of temporary structures on the university campus for administration and teaching purposes.
Works to the University of Sydney and St Paul's College including vegetation and tree removal, bulk earthworks, new retaining walls and relocation of stormwater drainage pipes.
S96(1A) application to delete condition 24 (Public Domain Plan).
s96 1(a) Relocate the 3 outdoor cabinets to extend screen wall on rooftop
Reconstruct existing partially demolished structure known as JRA McMillan Glasshouses A05A building within the University of Sydney into a storage facility, new hardstand area and widening the intersection of Science Road and Agriculture Lane.
Staircase upgrade including replacement of timber balustrade in southern vestibule of 'The Quadrangle' building at the University of Sydney.
New food outlet on level 2 of Manning House.
Installation of 6 new panel antennas and one new equipment shelter on rooftop of RMC Gunn building.
Construction of new grandstand, indoor cricket facility and licensed function room to Oval No. 2 of the University of Sydney Includes adjustment to Oval No. 2, landscaping, lighting and tree removal.
Installation of 8 new panel antennas and three new outdoor cabinets on rooftop of Brennan MacCallum building.
S96(2) - Amend Condition 3(a) for continued use of increased outdoor seating capacity of licensed restaurant 'Taste Baguette and Bar Restaurant' (Room 201 within law annex building) from 21 persons to 117 persons.
Alterations to Edward Ford building and Physics Building to improve accessibility.
Alteration and Additions to the chemical engineering building J01 at the University of Sydney to create additional and more efficient research space
Fitout of Room 201 of the law annex (F10A building )as a restaurant/cafe.
Demolition of 4 buildings and landscaping works.
Place of Public Entertainment licence renewal.
Installation of chemical storage and decanting building adjacent to Physics Building A28, and landscaping.
Storeroom for flammable gas cylinders associated with the Chemistry Building.
Section 96 (2) modification of the approved development for public domain works at Sydney University. The application involves realignment of Fisher Road (north of City Road) and associated works including new pedestrian crossings, new kiss and ride vehicle zone, realignment of median to City Road entry and new plantings.
S96(1A) Amendment of schedule 1A condition 1.
Repair works and new services to the Veterinary Science Round house at the University of Sydney.
New Single storey glasshouse, water tank, associated civil works, landscaping and paving.
Refurbish basement rooms N254 and N255 on level 2 of Pharmacy Building A15 as a central storage area for documents and research equipment.
Internal fitout of level 4 of Madsen Building for use as a library and Australian Classics Centre.
Demolition of the garage, front wall and concrete slab at the rear, and new garden hedge surrounds at the Veterinary Science Caretaker's Cottage.
Alterations to great hall for accesible entrance.
Alterations and additions to existing Bosch Building 1B including a single storey extension and internal reconfiguration of Level 1, new awning over main entrance, demolition of existing north-eastern stairs, new stairs at the south-eastern corner, new passenger lift between Levels 1 and 3, new service plant and equipment and associated landscaping works.
Section 96 (1a) amendment.remove all reference to construction certificate and occupation certificate from Conditions due to crown land.
Internal fitout of Level 2 of the University of Sydney John Woolley Building west wing link for the United States Study Centre Reception, external restoration of the heritage facade and associated landscaping to the front entry forecourt and courtyard three, deletion of six car spaces and removal of existing Cypress trees. Seven new trees of appropriate species will be planted within the site grounds.
Extension of trading hours of Manning House for event dated Sunday 30 September 2007. Hours of operation are restricted to 10:00am to 3:00am. Ref POPE 38/2006
Internal fitout of west wing level 2 of John Woolley building (A20)
Internal and external alterations including re-construction of ground level existing retail food court tenancies within Manning House.
Refurbishment and alterations to parts of levels 1 - 5 of the Badham, Bank and Pharmacy Buildings of the University of Sydney.
Internal and external alterations to the existing small animal medical hospital, known as the Evelyn Williams Building for use as a dog veterinary clinic. External works include landscaping, new external windows and skylights
Refurbishment and use of the club rooms on Level 1 and Level 2, associated with the Footbridge Theatre, as educational and student service facilities. Works include upgrading of the courtyard fronting Parramatta Road and the installation of a new lift and air conditioning plant room.
Section 96(1A) Provide in ground drainage and PAD footings to basement B2 only. Concrete slab to basement B2 only.
Fitout and Use theatre stage as a cafe. Works involve the provision of additional ground floor doorways, outdoor courtyard and internal changes.
Internal alterations to the Badham and Bank Building including a new mezzanine level to provide two (2) new teaching rooms, a new reception area and a new internal connection.
Stage 2 Consent for Camperdown Campus Public Domain works including the creation of an accessible pedestrian promenade along Eastern Avenue (and the closure of Eastern Avenue to vehicular traffic) linking City Road to University Place. Works will incorporate tree planting, furniture, water features, seating, lighting, artworks and the removal of 458 at-grade parking spaces (to be relocated to an approved underground parking area).
Stage 2 preparation works including demolition of the Stephen Roberts Lecture Theatre and Edgeworth David Building, bulk excavation of 72,800sqm of spoil, removal of 56 trees, retention of 1 tree and relocation of 1 tree and removal of existing traffic related infrastructure.
Construction of temporary buildings for teaching, research, meetings and office space to accommodate the Campus 2010 Programme.
Extension of pope for 3 hours 12 february 2005
Installation of a Steel framed glass awning on the eastern side of the Footbridge Theatre above the existing disabled access ramp entrance.