Applications ordered newest to oldest.
S4.55(2) - Modification of condition 4 of the original consent notice to continue current trial period for extended trading hours between 6:00am and 7:00am (for takeaway coffee and the like only) and between 10:00pm and 12:00 midnight (Monday to Sunday).
PAN-209936 Section 4.55(2) modification of consent to accommodate design development changes.
PAN-157849 - Section 4.55(1A) modification of consent for construction of a mixed use development. Proposed changes are to amend condition 130 to change the timing of the transfer of the title of the colonnade, through site link and associated air space from prior to the issue of the first occupation certificate to prior to the issue of the last occupation certificate.
PAN-105070 Alterations to use premises as restaurants and associated outdoor dining. Proposed trading hours are 6.00am to 12.00am (midnight), Monday to Sunday.
PAN-98824 - Section 4.55(1) modification of consent for construction of a mixed use development. Proposed changes are to correct a drafting error by deleting paving works shown beneath a stair between Macquarie Street and the Cahill Expressway adjacent to the site.
PAN-46110 - Section 4.55(1A) modification of consent to reduce the number of cabbage palm trees from 23 to 21, amend planter box design and relocate bin and bollard locations.
PAN-32344 - Section 4.55(2) modification of consent
PAN-19769 Section 4.55(2) modification of consent for construction of a mixed use development. Proposed changes are to modify condition 1 to permit internal changes, including minor amendments to structural, door, wall and apartment configuration, and external changes, including amendments to fenestration, awnings, louvres, structural profiles and doors, and to amend condition 113 to permit internal construction works from 7.00am - 12.00am midnight, Mondays to Saturdays inclusive.
Section 4.55(1A) modification of consent for construction of a mixed use development. Proposed changes are to modify condition 30 relating to public art to allow a Construction Certificate and Occupation Certificate to be issued following a public benefit offer and planning agreement.
S4.55 1(A) Modification to amend description of the development to include stratum subdivision of the site into four stratum lots together with stratum subdivision of part of Macquarie Street adjoining the site for lease purposes.
Section 4.55(1A) modification of consent for public domain and landscaping works. Proposed changes include the deletion of condition 2 requiring the installation of a screen.
Section 4.55(2) modification of consent for construction of a mixed use development. Proposed changes are to modify condition 113 to permit internal construction works from 5.00am - 12.00am midnight, Mondays to Saturdays inclusive, and condition 132B to correct an error relating to stratum subdivision and vehicle parking in common areas.
Section 4.55(1A) modification of consent for construction of a mixed use development. Proposed changes are to modify condition 92 and condition 93 to amend the timing of submission of physical and electronic CAD models to the City.
Section 4.55 modification application to the Vivid Light Walk - East Circular Quay Precinct. The proposed modifications include modifying the activation areas, bump in and bump out activites between 12.00 midnight and 6.00am, and additional event activities from 3.00pm to 6.00pm, and from 12.00 midnight to 6.00am during the 2019 event.
Section 4.55(1A) modification of consent for construction of a mixed use development. Proposed changes are to amend Condition 37 to delete the requirement for a Medium Rigid Vehicle loading dock and insert a requirement for a Small Rigid Vehicle loading dock, Condition 45 to amend the maximum service vehicle size limit from 8.8 metres to 7.7 metres, Condition 91(e) to allow for domestic waste collection by a private contractor and deletion of Condition 134 requiring basement waterproofing.
Bump in and out for Australia Day Live, 2020, 2021, 2022, 2023 & 2024 between Midnight and 6am around Circular Quay for safety barriers and portable toilets.
Temporary placement and illumination of Chinese New Year festival lanterns for a 10 day period during each Chinese New Year between 2019 and 2023.
S4.55 1(A) Amend Condition 32 so that the registration of the Right of Carriageway is required to be registered prior to issue of an Occupation Certificate
Installation of light sculptures and temporary structures in association with Vivid Light Walk at various locations within East Circular Quay. Event to operate between 1 May and 30 June for the following 5 years. In 2018, Bump-In and Bump-Out is proposed to occur on 11 May and 16th June, respectively, with the event held between 25 May to 16 June. From 2019-2022, the program includes up to 15 days 'Bump-In' (from 6.00am to 12.00 midnight), 23 days for the actual event (from 6.00pm to 12.00 midnight), and up to 10 days 'Bump-Out' (from 6.00am to 12.00 midnight). Additional hours of 12.00 midnight to 6.00am over 4 nights during Bump- In and over 2 nights during Bump-Out may occur due to program or weather delays.
Use of numerous locations for the installation of 10 temporary outdoor signage structures in association with the 'Biennale of Sydney' which will run from 16 March - 12 June 2018. Bump in for the structures will occur from 6.00am -10.00am on 16 March 2018 and bump out will occurr from 6.00am - 10.00am on 12 June 2018.
S96(1a) - Amendment to condition 101(D) in order to provide clarification to approvals required for excavation within building footprint.
Section 96 1(A) Modification to condition 13(c) to allow alternative arrangement for Heritage floor space
Section 96(2) modification of consent for the demolition of the existing buildings on the site and associated works. The application seeks approval to delete Condition 27 which restricts the use of intrusive appliances during demolition.
Section 96(2) modification of consent for bulk excavation and erection of a 20 storey mixed use development (including a through-site link from East Circular Quay to Macquarie Street and a colonnade to East Circular Quay, with 109 residential/serviced apartments, associated communal areas, retail tenancies, 6 basement levels for 103 car parking spaces and public domain improvement works. Proposed changes include reducing total number of apartments to 104; change dwelling mix to increase two bedroom units (from 18 to 22) and reduce number of one bedroom units (from 63 to 55); internal reconfiguration of units; amendment to the arrangement of the through-site link, including the relocation of the public lift; removal of the separate residential and serviced apartment entries and expand the retail frontage to the East Circular Quay level; consolidation of residential entries on Macquarie Street; facade changes (including removal of wintergardens on levels 14-19); and internal reconfiguration of the basement. The application is Integrated Development under the Water Management Act 2000, requiring the approval of Water NSW.
Temporary installation of signage and infrastructrue throughout the CBD, associated with the 2016 Biennale of Sydney.
Landscaping and Public Domain works at East Circular Quay including the removal and transplanting of existing Cabbage Tree Palms, paving, installation of public furniture and lighting. The application also includes the location and envelope for a future cafe and 4 associated fixed umbrellas among the grove of palms
Integrated Development Application for the demolition of the existing building and structures on site, site preparation works, removal of existing trees (1 on Macquarie Street and 5 on Circular Quay East), modified pedestrian and vehicular access arrangements along Circular Quay East frontage (including to the Quay Grand Apartments) and construction of temporary perimeter fencing and hoarding.
Bulk excavation and erection of 20 storey mixed use development including a through site link from East Circular Quay to Macquarie Street and a colonnade to East Circular Quay, including 109 residential/serviced apartments, associated communal areas and facilities, retail tenancies, 6 basement levels accommodating 103 car parking spaces and public domain improvement works.
Section 96 (2) modification of the approved development to modify the dates that temporary signage and infrastructure will be installed in association with the 2014 Biennale of Sydney (a visual arts event), and modification to the location of temporary signage structures associated with this event.
Temporary signage and inrastructure associated with the 2012 and 2014 Biennale of Sydney.
Temporary installation of an information booth and three information pylons in conjunction with the Sydney Festival 2012
5 free standing signs for 12 weeks for Biennale of Signage maps.