Loading...

D/2019/511

Print
Address
58 Pirrama Road PYRMONT NSW 2009
Applicant
AUSTRALIAN NATIONAL MARITIME MUSEUM
Description
Erection of art installation including 33 column structures 2.8m high and 800mm wide, made of PVC with precast cylindrical concrete bases. The columns will be arranged in three groupings. 10 cylindrical precast concrete blocks for seating will also be installed with shortblast finish and dimensions of 520mm x 760mm. The installation will be erected between 28th July 2019 and 1st April 2020.
Estimated cost
$98,152.00
Lodged date
17/05/2019
Decision
Approved
Decision date
17/07/2019
Decision by
City planning unit
Map showing boundary of site