Applications ordered newest to oldest.
Temporary event for the use of Bays 21-25 for Summer Concerts on 6-9, and 14 December 2024, proposed operating hours are between 5.00pm and 11.00pm.
Temporary event for the use of Bays 22-25 for Good Food and Wine Christmas Market. It is for an internal market on Friday 22nd November, Saturday 23rd November and Sunday 24th November 2024.
Temporary extension of operating hours for a performance event and associated activities until 2am on the early morning of 27th October 2024 as part of the annual Liveworks Festival.
Application to extend hours of operation for Carriageworks on 18-19 February 2023 to allow two events for a 24 hour period as part of Sydney World Pride 2023.
Liveworks Festival 2018 at Carriageworks - Application to extend operational hours on 19th October to 21 October and on 27 October to 28 October to allow performances to end at 2.00am.
Use of numerous locations for the installation of 10 temporary outdoor signage structures in association with the 'Biennale of Sydney' which will run from 16 March - 12 June 2018. Bump in for the structures will occur from 6.00am -10.00am on 16 March 2018 and bump out will occurr from 6.00am - 10.00am on 12 June 2018.
Temporary use of the site for two licensed music events as part of ‘Vivid Festival’ and associated temporary structures on 2 June 2017 and 11 June 2017
Replacement of chillers and air-conditioning plant to western facade and new plant housing to match existing plant housing on the site
Works to Chief Mechanical Engineers Building
Integrated Development for one off licenced music event on 8 September 2013 within and around the North Eveleigh Carriageworks including installation of temporary stage structures and food stalls.
Integrated development application for the staged construction of a Local Park and Pocket Park in the north western part of the North Eveleigh Precinct, works include pedestrian links to Wilson St, furniture, terracing and associated retaining walls, community garden, landscaping, reuse of heritage elements, addition to the Blacksmiths Workshop and stormwater and demolition works.