Applications ordered newest to oldest.
Two illuminated business identification signs
Use 14.57sqm of footway on Bowden Street for outdoor dining in association with 'Cafe 0.6'. This is a renewal of a previous approval.
Use of 14.57sqm of the public footway on Bowden Street for outdoor dining in association with 'Cafe 0.6'. Proposed hours of operation are between 7:00am and 7:00pm Monday to Saturdays and between 9:00am to 6:00pm on Sundays and Public Holidays.
S4.55(1A) - Modification of consent involving the stairs on Level 3 to be removed and infilled. Modification of Condition 10 (Floor Space Ratio - All Other Areas) to reflect new floor space ratio.
S4.55 (2) Extension of trading hours for the educational facility and first floor restaurant to include Saturday and Sunday 6.00am-10.00pm. Extension of trading hours for the ground floor cafe to include 6.00am-5.00pm Monday-Sunday. Use of first floor balcony for outdoor dining associated with the training restaurant and use of outdoor footpath wholly within the site for seating and tables to front of training cafe.
Section 4.55(1A) Modify condition No 1 - deletion of proposed stairwell and void. Replacement of double doors with single door. Use of existing window as a pass through coffee sale window.
Change of use of level 1 and part of the ground floor of the existing commercial building to an educational establishment for hospitality training with associated fitout and ancillary training restaurant and cafe. The proposal includes alterations to the front facade including works to the building entrance, signage and installation of a rooftop mechanical exhaust system to the rear of the building. The proposed hours of operation are 6.00am – 10.00pm, Monday to Friday. The proposed maximum number of staff and students is 235.
Use of the public footway on Bowden Street for outdoor dining associated with licensed cafe 'Vie Studio' (15sqm in area). Proposed hours of use are 6am to 8pm, Mondays to Sundays inclusive.
D/2015/848 - Monetary contribution of $281,757 for community infrastructure and easement for public access.
Alterations and additions to existing warehouse and light industrial building including partial demolition, erection of 2 new additional levels, new substation and ground level parking for 55 cars. The proposed use is shop at ground level and commercial offices on the upper three levels.