Applications ordered newest to oldest.
Section 96(1a) to amalgamate unit 13.11 and 13.12 into one unit
Section 96(1A) modification of consent for additions and alterations to the former Crest Hotel for residential and retail uses and associated car parking. Proposed changes include 7 additional car parking bays, alterations to the ground level shopfronts and internal alterations to the lift shaft and plant room
Section 96(1A) modification of consent to amend condition 108 (Use of Intrusive Appliances - Not Approved) to permit the use of appliances during the refurbishment stage between January to September 2016. (Note: First S96 modification to Consent to be Approved)
Section 96(2) modification of consent for additions and alterations to the former Crest Hotel for residential and retail uses and associated car parking. Proposed changes include increase gross floor area (18m2); increase from 131 to 134 apartments (change to mix and layout); increase from 59 to 67 car parking bays; external and internal alterations to accommodate roof services, additional north facing windows, reconfiguration of communal open space, waste, plant and storage requirements. Changes are also proposed to relevant conditions of consent.
Section 96(1A) modification of consent to amend Condition 103 (Sydney Trains Requirements) for additions and alterations to the former Crest Hotel including conversion to residential and retail uses
s96 (2) Modification to amend the approved Stage 1 building envelope for the site known as the former Crest Hotel and remove a condition requiring detailed contamination investigation. Modifications to the building envelope seek to ensure consistency with the concurrent development application for the detailed design of the building (Stage 2 DA). Changes largely relate to the western side of the the tower envelope, no increase in height is proposed.
Stage 2 development application (detailed design) for alterations and additions to the existing building known as the former Crest Hotel comprising conversion from hotel accommodation to 139 residential apartments and retention of existing ground floor retail uses, a new supermarket and specialty retail at Level 1 and 58 basement car parking spaces accessed from existing entry point on Victoria Street.
Extended trading hours for the Goldfish Bowl and Sports Bar and Gaming Room and Botttle shop located in the Crest Hotel.
Stage 1 DA to establish building envelope and design parameters for proposed redevelopment including the retention of the existing structure and alterations and additions to accommodate a mixed use development comprising residential units within a 14 storey tower over a 5 storey podium containing a mix of residential and commercial uses, with basement parking.
Section 96(2) to continue 24 hour trading at the Crest Hotel, including the Gold Fish Bowl, the Sports Bar, gaming room and bottle shop for a trial period of 5 years.
Demolition of all internal structures on level 1 of the Crest Hotel
Four Lot Stratum Subdivision of the site, being Lot 1 DP 233062.
Four lot Strata Subdivision of the site, being Lot 1 DP 233062.
Section 96 application to modify condition 2(b) to allow 24 hour trading, 7 days per week of the ground floor of the existing hotel (Crest Hotel) for a 5 year trial period; amend condition 4 to refer to the amended Plan of Management dated 26 May 2010; modify conditions 9, 34, 35, 36 and 37 to reflect the amended Plan of Management; and delete conditions 14, 15, 24(c), 25, 26 & 33(a) relating to public entertainment.
Internal building fire safety upgrade and lift refurbishment to the Chifley Hotel. There is no external work proposed.
Goldfish Bar. Additional signage to Darlinghurst Road, remove four banks of louvers and addition of awning to Victoria Street. Development consent is also sought to have the remaining louvers open until 4.00 am seven days a week.
Section 96 -Amend the development description and plans to include an entrance on Victoria Street.
Fitout of TAB tenancy & incorporation of adjoining tenancy
Refurbishment of the Goldfish Bowl Bar, Sports Bar, Bottle Shop and converting the existing Peppermint Lounge (nightclub) into a gaming facility within the Crest Hotel on the corner of Darlinghurst Road and Victoria Street, Potts Point. The application also seeks consent for the demolition and removal of part of the glazed shopfronts and replacement with a decorative metal and glass facade. The proposed hours of construction are Monday to Friday 7:00am to 11:00pm and Saturday to Sunday 7:00am to 5:00pm.
Fitout and use of southern end of level 2 to accommodate 4 function training rooms which form part of existing hotel.
Internal alterations to the first floor of the existing Bathhouse.
S96(1A) modification to amend condition 1 to include revised plans relating to the change in the existing facade features at the Darlinghurst Road Elevation.
Section 96AA(1) Continue trial trading hours to allow 24 hour trading 7 days a week at the Crest Hotel including the Goldfish Bowl Bar, Internet Café, Sports Bar, Bottle Shop, TAB and Gaming Lounge and continuing trial trading hours for Peppermint Lounge 10am to 3am the following day Sundays (excluding Sundays followed by a Public Holiday), Mondays, Tuesdays, Wednesdays and between 10am to 5am the following day Thursdays, Fridays and Saturdays and Sundays that are followed by a Public Holiday.
Alterations and additions to podium levels (being basement, ground, and levels 1 and 2) of the Crest Hotel including refurbishment works to the podium facade. The works will relocate the entrance lobby from the ground level Darlinghurst Road frontage to the basement level Victoria Street frontage, make good level 1 and fitout of restaurant at eastern end of level 2 to operate between the hours of 6:00am and 12:00 midnight, 7 days per week.
Section 96 Modification application to modify consent to allow bagging & painting of facade of Crest Hotel.
Facade maintenance - removal of cladding repair of concrete spalling & replacement of windows of tower from level 3 to roof
Full colour animated laser light commercial advertisement for bottled water projected onto the south facing side of the Crest Hotel on Darlinghurst Rd between 1 and 30 November 2006 daily from dusk till dawn. Duration of each sequence in the loop is 8 seconds.
Approval for 2 year trial period for 23 hour trading,(7am to 6am) seven days a week, for the ground floor area of The Crest Hotel, incorporating the Goldfish Bowl Bar, Internet Cafe, Sports Bar, Bottle Shop, TAB and Gaming Lounge. The Peppermint Lounge nightclub is approved for a 2 year trial period for trading between the hours of 10am and 5am the following day on Thursdays, Fridays and Saturdays.