Applications ordered newest to oldest.
S4.55(1A) - Modification of consent for alterations to the layout and joinery on each floor, changes to the facade colours and finishes and modify the signage.
Alterations and fit out for retail use including demolition, internal and external works and new signage.
Alterations and additions to commercial development, including signage
Section 96(1A) modification of consent for alterations and additions to the existing building. Proposed modifications relate to internal lighting.
Section 96(1A) modification of consent for fit-out and use of ground floor of premises as a Telstra retail shop. Proposed changes relate to reconfiguration of internal partitions and modifications to lighting, ceilings and finishes.
Section 96 (1A) modification of consent for alterations and additions to existing buildings. Proposed changes relate to the approved awning, facade modifications and size of void at Level 1 of 400 George Street, modification to internal void in 396 George Street and modification to the extent of opening between 396 and 400 George Street.
Section 96(2) modification of consent to amend Condition 30 (Hours of Work & Noise) to allow extended construction hours to occur 24 hours a day, 7 days per week.
Installation of business identification signage, external building lighting and LED lighting within glass box roof structure.
Fitout and use of ground floor of premises to create Telstra retail shop.
Alterations and additions to existing buildings, including facade modifications, fenestration changes, new awning along George and King Street frontages, new roof structure to No. 396 George Street and internal reconfiguration works
Use of shop as a convenience store and photo accessory store.
Retail interior fitout and new external signage.
Internal layout changes to level 1 of the approved refurbishment of the Darrell Lea retail shop.
Refurbishment of existing ground floor retail tenancy including alterations to the shopfront, signage, painting and repair works to the building façade and internal layout changes including the removal of the mezzanine level and stairs and use of the first floor as additional retail space.
Fitout of existing vacant shop within (Heritage Item) for a fashion accessory retail shop including New shop front and signage .