Applications ordered newest to oldest.
  
    
    Land Subdivision into two lots
   
  
    
    S96(1A) - Modification of Condition 1 - change plan reference.
   
  
    
    Section 96(1A) modification of consent to Stage 1 proposal comprising 318 new dwellings in residential apartment buildings and townhouses ranging from 2 to 8 storeys, car parking for 213 vehicles; and detailed design and construction of buildings A, B and C comprising a total of one retail space, 263 dwellings, 197 car parking spaces and associated infrastructure, landscaping and public domain works; and the staged subdivision of the site into 3 lots.  Proposed changes are enclosure of study areas, reconfiguration of substation in Building B, modifications to Building A & B elevations, reconfigure basement storage, increase terrace size on Level 7 of Building C, reduced floor to ceiling heights.
   
  
    
    Amendment to Condition 35 relating to stormwater drainage requirements, deletion of Condition 39 relating to electricity substation & amendment to cost of works
   
  
    
    Amend Conditions 28 and 29 to allow for public domain works to be submitted and approved prior to a Construction Certificate being issued for public domain works instead of new building works
   
  
    
    s96 1 (a) amendment to conditon 46, and amendment to car park allocation.
   
  
    
    D/2013/784 - Construction and dedication of a new verge and footway to MacDonald Street, new roads and shared pedestrian/traffic areas at Metters Street, Pearl Street and Bridge Street, construction and dedication of a new pocket park and the construction and dedication of a pedestrian link and landscaping works.
   
  
    
    Section 96(1A) modification of approval for 16 new terraces to provide new blade walls and detailed design refinements to the facade of all dwellings, replacement of fixed car port roofs with retractable roofs, minor changes to design of upper level decks and deletion of Condition 3 requiring compliance with annotations on drawings.
   
  
    
    S96(1A) Modify condition 30(B).
   
  
    
    S96(1A) Modify of condition 77(B).
   
  
    
    Stage 2 development of Building D (Lot 3) for the construction of a 7 storey residential flat building containing 41 apartments, 41 bicycle storage spaces and landscaping.
   
  
    
    S96AB Review of Determination to reinstate original condition no. 13 - Car Parking Spaces and Dimensions.
   
  
    
    Stage 2 development of Building E (Lot 2) comprising demolition of the existing temporary display suite, subdivision of Lot 2 to create 16 torrens title lots and construction of 16 residential townhouses.
   
  
    
    S96(1A) Modification to amend minor errors and mis-descriptions, cost of development, Condition 2 (Staged Construction), Condition 13 (Car Parking Spaces and Dimensions, Condition 34 (Shared Zone), Condition 71 (Demolition/Site Rectification), Condition 74 (Alignment Levels), Condition 75 (Public Domain Plan), Condition 76 (Public Domain Works - Hold Points and Handover), Condition 81 (Road Network and Geometric Design and Construction), Condition 83 (Stormwater Pipe Re-Alignment), Condition 84 (Flood Planning Levels for Development), Condition 112 (Staging of Subdivision), Condition 126 (Dedication of Road Widenings and Roads - Stage 1 Subdivision Proposal), Condition 127 (Easements), Condition 128 (Dedication of Road Widenings and Roads - Stage 2 Subdivision Proposal) and Condition 129 (Dedication of Road Widenings and Roads - Stage 3 Subdivision Proposal).
   
  
    
    S96(2) modification to amend Condition 4 (Design Modifications, Building D) relating to the right of carriageway and easement and Condition 95 (Hours of Work and Noise) to extend building and excavation work to  between 7.00am and 6.00pm, Mondays to Fridays and between 7.30am and 4.00pm Saturdays.
   
  
    
    Section 96(1A) modification to amend Condition 1 'Approved Development' relating to the configuration and location of the temporary display suite and associated car park; Condition 21 'Noise'; Condition 28 'Land Contamination'; Condition 41 'Access for persons with disabilities (office) and Conditions 53 to 56 'Trees'.
   
  
    
    Stage 1 concept proposal (site layout, public open space, street network and building envelopes) comprising 323 new dwellings in residential apartment buildings and townhouses ranging from 2 to 8 storeys, 75sqm non-residential floor space and 30,959sqm residential floor space and car parking for 222 vehicles; Stage 2 proposal (detailed design) comprising basement level car parking for 167 vehicles and ground level car parking for 55 vehicles; construction of a 8 storey residential apartment building (building 'A') comprising 75sqm non-residential  and 8,284sqm residential floor space containing 89 dwellings;  construction of a 8 storey residential apartment building (building 'B') comprising 8,460sqm residential floor space containing 86 dwellings; construction of a 8 storey residential apartment building (building 'C') comprising 8,842sqm residential floor space containing 89 dwellings; infrastructure, landscaping and public domain works and the subdivision of the site into 3 lots (site frontage to MacDonald Street and Bridge Street).
   
  
    
    Demolition of existing industrial building and structures, tree removal, excavation,(associated with the site remediation only) construction of site hoarding and fencing, construction of a temporary display suite with associated landscaping and car parking for 24 vehicles, and signage within the site and  along the Macdonald Street and Bridge Street frontages.