Applications ordered newest to oldest.
Excavation works and the installation of a test tank within an existing industrial building
Extension of operating hours of local distribution premises in Unit 5
PAN-78311 – Removal of existing sign and Installation of free-standing pylon sign fronting Euston Road measuring 2230mm (h) x 1000mm (w).
PAN-72656 - Erection of signage on existing warehouse.
Change of use and fit-out of an existing industrial unit (unit 14) for a use as a children play and party centre (indoor recreation facility).
Section 96(2) modification application to amend the approved DA2 plans to reduce the scope of works covered by DA2, amend and reconfigure light industrial tenancies and provide an additional car space
Erection of a freestanding steel framed mezzanine storage platform and increasing the size of the exisiting loading dock area.
DA2 Western Sector of the Site - Partial demolition and alterations and additions to the existing building to create 3 levels containing 51 tenancies, demolition of an existing building, construction of a six storey above ground multi deck car park structure containing 279 spaces and 3 tenancies and use of the building as an industrial estate containing light industry, high technology industry, industrial retail outlets and site landscaping.
DA1 Western Sector of Site - Partial demolition and alterations and additions to the existing building to create 3 levels containing 13 tenancies, ground level parking for 76 vehicles, landscaping and use of the building as an industrial estate containing light industry, high technology industry, ancillary industrial retail outlets, food and drink premises and an indoor recreation facility (gym).
Erection of 6 new estate identification/directional signs and removal of 4 existing signs.
Use and fitout of industrial Unit 15 within 'Perry Park Estate' as a Geophysical Testing Facility with existing mezannine level used as an office area.
Construction of a new dividing wall, amenities block and shared entry/exit lobby within warehouse Building B, new roller door and vehicle access from Maddox Street and subdivision of the site into two lots.
Fit-out and occupation of unit 3 for use as commercial printing business operating 24 hours Monday to Saturday
Internal fitout and use of an existing industrial unit as environmental sample testing facility with operating hours from 7:00am to 11:00pm five days a week