Applications ordered newest to oldest.
Alterations and additions to partition Level 1 to create two tenancies, and the fit-out and use of the western tenancy as a pilates studio
Internal demolition and alterations and additions to the existing building, including a new three storey plus rooftop addition, to accommodate commercial uses.
PAN-168571 - Alterations to commercial development including a new awning along Flinders Street and Bourke Street and external paint works
PAN-105848 Alterations to commercial development
Heritage Works Exemption for internal maintenance works
Heritage works for commercial offices
Carry out maintenance/repair work to level 1 of the building which is in poor condition and stop water leaks, damage & further deterioration.
Repainting the external facade to a more sympathetic colour and finish similar to the original
Section 96(2) to modify the approved bike hub, retail bike shop, cafe and offices. The modifications include changes to entrances and windows, reduced awning on Patterson Lane, increase in the lift overrun height by 155mm and modification of condition 4 to allow rooftop access for maintenance and between 7am and 8pm, Monday to Friday for building employees.
Section 96 (2) application seeking to extend the temporary approval for the existing art installation (facade paint scheme) for a further 5 years.
Alterations and additions, and use of existing commercial building as a bike hub, comprising a bicycle retail related shop, a cafe and offices; and external works.
Temporary painted artwork to the full facade of the building on display for a period of 6 months from September 2012 to March 2013.
External facade refurbishment including; a new zinc awning to wrap around the Flinders and Bourke Street facades; stripping back existing paintwork to reveal original face brick; and, rendering of original rendered components of facade (parapet and window surrounds).
Section 96(1A) application to amend the approval period from 6 months to a 3 year period.
Temporary use of the building. Basement floor as storage, ground floor to display art made from recycled rubbish (mezzanine floor as offices) and uppermost floor as artist's working space.
Application for a PoPE Licence for the Taylor Square Hotel, including musicians, singers, DJs and a dance floor, between the existing operating hours of 7am and 3am seven days a week.
Internal alterations to gaming room at third floor level.
Repaint heritage facade with new colour scheme.