Applications ordered newest to oldest.
Demolition of the existing podium and construction of a new 8 storey podium, comprising a mix of retail and commercial floorspace, alongside external refurbishment works and public realm upgrades.
Alterations and additions to existing end of trip facilities; relocation and deletion of loading spaces; creation of a "wellness" centre; refurbishment of existing bicycle store, all on level P1 (Kent Street level).
Fitout of levels 7, 8, 9 and 10 including inter-tenancy stairs.
Installation of shopfront signage and an underawning sign showing 'Priceline' branding.
Fit out and use as pharmacy and retail store with mezzanine office space. Hours of operation are 8.00am - 9.00pm Monday to Friday, 8.00am - 6.00pm Saturday and 8.30am - 6.00pm Sunday.
Refurbishment of existing pedestrian tunnel including installation of illuminated advertising panels and directional signage, new floor treatment, upgrade lighting and repainting.
Section 96 Modification - Amend the development description to rear 'PKF' instead of "PFK'
Removal of 4 existing 'Travelex' signs and installation of 4 'PKF' roof signs and lower level business identification signage on an existing commercial building fronting Kent, Margaret and Clarence Streets.
Fitout of ground level Shop 2 and use as a retail printing shop including partitioning works and new signage.