Applications ordered newest to oldest.
Use of Pier 2/3, Wharf 4/5 and its Shore Sheds, and the area of harbour in-between for the annual Sydney Festival events for a 3-year period commencing in January 2025. The event includes performance, dance and music activities, outdoor furniture, outdoor dining, provision of food trucks, installation of temporary structures including mechanical services, art displays and signage.
Installation of two new flagpoles for fabric signage banners on the Hickson Road facade of Shore Shed 4/5.
Installation of lighting and visual technology in association with Vivid Sydney Temporary Community Event for 10 event years commencing in May 2024. The 2024 Event to operate between 24 May 2024 to 15 June 2024, 6.00pm to 12.00 midnight, Monday to Sundays inclusive. The future event dates will vary each calendar year.
Fast Track S60 - Erection of back lit signage above entry doors to Sydney Dance Company on southern
façade of Wharf 4/5 in the Breezeway.
PAN-91065 Alterations/additions to entertainment facility
Use of Piers 2/3 and 4/5 for the 'Sydney Writers' Festival' temporary event from on 22 May 2017 to 28 May 2017, including the use of temporary structures, services and signage. Proposed hours of operation are between 9.00am and 11.30pm. Bump-in operations will occur from 8 May 2017 to 24 May 2017 and bump-out will occur between 27 May 2017 and 2 June 2017.
Installation of telecommunications infrastructure including underground housing, underground conduit or cable, underground lead in cable, above ground housing.
Use of Piers 2/3 and Piers 4/5 for the Sydney Writers Festival and including temporary signage on Hickson Road from Monday 16 May to Sunday 22 May 2016 and associated temporary infrastructure and services.
Installation of temporary event structures in association with the Sydney Writers Festival between 13 - 26 May 2015. Structures are proposed on Pier 2/3 and Pier 4/5 including two marquees on the footpath adjacent to Hickson Road.
Installation of temporary event infrastructure along the aprons of Piers 2/3 and 4/5 as well as along the footway, adjacent to 21-21A and 15 Hickson Road and 142 George Street for the Sydney Writers' Festival.
Temporary event infrastructure associated with the Sydney Writers Festival including signage along Hickson Road and temporary structures along the wharf aprons.
Refurbishment of the existing function space and existing tea room. Including installation of split system air-conditioning and removal of suspended ceiling.
To set-up temporary event infrastructure for 250 seat venue upstairs in Pier 2/3 & usage of Pier 4/5 for the 2010 Sydney Writers Festival 17 to 24 May.
Continuation of use as an Entertainment Venue for Bangarra Dance Theatre at ground, mezzanine floor levels.
Enclosure and use of existing internal mezzanine of the Shoreshed Wharf 4/5 as office space.
Construction of a mezzanine level with office, workshop and storage areas at the Sydney Theatre Company.
Installation of a solar energy system along the length of the Pier 4/5 roof.
Temporary installation of a mezzanine level within the Wharf 2 theatre upon level 3 of Pier 4/5.
Renewal of Pope licence for theatres located on Pier 4/5 premises of the Sydney Theatre Company Wharf 1 theatre & Wharf 2 Theatre
Integrated development application for the construction of an external accessible lift shaft upon the eastern elevation of Pier 4/5 serving the ground, first and mezzanine levels of the Sydney Theatre Company, plus the installation of a new section of flooring upon level 3 and external handrails and tactile surface indicators to the existing external staircase.
To relocate the existing mobile seating units in Wharf No. 2 theatre so as to place aisles on the sides to improve the seating units and audience sight lines to the stage.
Installation of temporary structures on pier 4/5 for the Sydney Writer's Festival.
Installation of temporary infrastructure at Pier No.2/3 and 4/5 to be used in conjunction with the Sydney Writers Festival on Monday 19 May to 26 May 2008.
Use of the premises as a Place of Public Entertainment to allow public performances in existing Australia Theatre for Young People studio at Wharf 4/5 of Walsh Bay.
Construction of additional seating tiers at the Wharf 1 to Increase capacity by 33 seats.
Installation of a platform on the roof of Wharf 4/5 at Walsh Bay to accommodate an air conditioning condenser unit.
Use of existing studio for public performances by the Australian Theatre for Young People (ATYP) at Wharf 4/5 of Walsh Bay.